Laserfiche WebLink
C- 2010 -089 PAR No. 2 <br />New Horizon North Mine <br />2.04.12 — Prime Farmland Investigation <br />1. Response accepted. <br />2.04.13 — Annual Reclamation Report <br />1. Response accepted. <br />2.05 — OPERATION AND RECLAMATION PLANS <br />2.05.2 — Operation Plan — Estimated Area for Life of Operation <br />9- Sep -2011 <br />Page 12 of 25 <br />1. Response accepted. <br />2. Response accepted. <br />3. Response accepted. <br />4. Map 2.05.2 -1 shows the general areas expected to be mined in a given year. It would be <br />useful to include also a depiction of the individual cuts or pits, as currently shown on Map <br />2.05.3(6)(a) -1 (Blast Notification). Please incorporate the individual cuts or pits into Map <br />2.05.2 -1 (or another map, as appropriate). <br />DRMS: The cover letter dated May 26, 2011 states that the individual cuts have been added <br />to Map 2.05.2 -1, but this does not appear to be the case. Please revise Map 2.05.2 -1 to show <br />the individual cuts, as illustrated on the Blast Notification map. <br />5. Response accepted. <br />6. Response accepted. <br />2.05.3 — Operation Plan — Permit Area <br />1. Response accepted. <br />2. Response accepted. <br />3. Response accepted. <br />4. Response accepted. <br />5. Response accepted. <br />6. Response accepted. <br />7. Response accepted. <br />8. Response accepted. <br />9. Response accepted. <br />10. Response accepted. <br />