My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-30_REVISION - M1977215 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-08-30_REVISION - M1977215 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:47 PM
Creation date
9/9/2011 7:46:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
8/30/2011
Doc Name
Tailings Pond 2 Evaporation Pond Technical Specifications
From
Rio Grande Silver
To
DRMS
Type & Sequence
TR17
Email Name
RCO
SSS
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.13 BALLAST INSTALLATION <br />A. The Contractor shall install liner ballast within the pond to ensure that the <br />liner is stable. <br />B. The ballast shall be spaced at 30 foot centers perpendicular to the pond <br />slope contours and across the bottom of the pond. Ballast shall also be <br />placed along the toe of the slope of the berms. <br />C. The Contractor may present ballast option(s) of sufficient weight and <br />distribution to prevent uplift and wind damage to the exposed surfaces of <br />the pond liner. The ballast option(s) shall be such not to damage or <br />otherwise adversely impact the integrity and performance of the liner. <br />The ballast option(s) shall be placed assuming the pond is empty and it <br />shall be chemically stable to exposure to sunlight. Details and a plan <br />view of the Ballast option(s) shall be presented for review and approval by <br />the Engineer prior to the start of installation of the liner. <br />D. Temporary ballast placed by the liner installer for stabilization of the liner <br />during installation does not constitute an alternative to permanent ballast, <br />but may be included in the Contractor's option(s) submitted for review and <br />approval by the Design Engineer. <br />PART 4 MEASUREMENT AND PAYMENT <br />4.1 MEASUREMENT <br />A. All HDPE geosynthetic liner will be measured for payment per square <br />yard installed including all folding, seaming, and anchoring. <br />4.2 PAYMENT <br />A. Compensation to the Contractor for geosynthetic liner shall be based on <br />the unit price and quantity placed in the bid schedule. <br />Rio Grande Silver Tailings Evaporation Pond <br />END OF SECTION 02620 <br />02620 -25 Geosynthetic Liner <br />August 2011 02620 <br />