My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-30_REVISION - M1977215 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-08-30_REVISION - M1977215 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:47 PM
Creation date
9/9/2011 7:46:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
8/30/2011
Doc Name
Tailings Pond 2 Evaporation Pond Technical Specifications
From
Rio Grande Silver
To
DRMS
Type & Sequence
TR17
Email Name
RCO
SSS
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Field Trial Seams <br />1. Trial seams shall be conducted at the beginning of each seaming <br />period and within thirty (30) minutes of commencement of <br />seaming, at the Design Engineer 's discretion, and immediately <br />following any work stoppage (i.e., lunch, weather conditions, etc.) <br />of thirty (30) minutes or more for each seaming apparatus used <br />that day. Each Seamer shall make at least one trial seam each <br />day. <br />2. Testing shall include visual observation of a trial seam on the <br />geosynthetic material. The Installer will mark the trial seam with <br />date, ambient air temperature, welding machine number, welding <br />technician identification, and machine temperature and speed. <br />For extrusion welding, the Installer will include the nozzle and <br />extrusion settings and welding technician identification. The <br />remainder of trial seam should be cut in two pieces; one to be <br />retained in Rio Grande Silver's archive; and one to be retained by <br />the Installer. <br />3. All trial seams shall be made at a location selected by the Design <br />Engineer in the area of the seaming and in contact with the <br />subgrade. The trial seam samples shall be 10 ft long for fusion <br />seaming and 5 ft long for extrusion seaming, with the seam <br />centered lengthwise. Specimens 1 inch wide shall be cut from <br />opposite ends of the test seam by Contractor. Contractor shall <br />use a tensiometer to test these specimens for shear and peel. <br />Both inside and outside tracks of fusion welds will be tested for <br />peel. For both fusion and extrusion welds, two (2) coupons will be <br />tested for peel and one (1) coupon for shear. The tensiometer <br />shall have a grip separation of 4 inches plus the width of the <br />seam. The seam is to be centered between the clamps. The grip <br />separation rates for LLDPE are twenty (20) inches per minute for <br />shear and twenty (20) inches per minute for peel. These tests <br />shall not fail according to the criteria in Section 2.01. A break <br />through the weld or at the weld /sheet interface shall be considered <br />a failure in both shear and peel strength tests unless the weld <br />strength exceeds the sheet strength, as discussed in Section 2.01. <br />If a trial seam fails to meet field seam Specifications, the seaming <br />apparatus and /or seamer shall not be accepted and shall not be <br />used for seaming until the deficiencies are corrected and two <br />consecutive successful full trial seams are achieved. <br />4. Contractor shall mark the test weld with date, ambient <br />temperature, welding machine number, welding technician <br />identification, machine temperature, and speed. For extrusion <br />welding, Contractor shall record the nozzle and extrusion settings. <br />Rio Grande Silver Tailings Evaporation Pond 02620 -18 ^ Geosynthetic Liner <br />August 2011 02620 <br />
The URL can be used to link to this page
Your browser does not support the video tag.