My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-30_REVISION - M1977215 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-08-30_REVISION - M1977215 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:47 PM
Creation date
9/9/2011 7:46:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
8/30/2011
Doc Name
Tailings Pond 2 Evaporation Pond Technical Specifications
From
Rio Grande Silver
To
DRMS
Type & Sequence
TR17
Email Name
RCO
SSS
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
those actions taken by them to ensure that their materials and <br />workmanship meet the requirements of the plans and project <br />Specifications. <br />1.6 CONTRACTOR ASSISTANCE <br />A. The Contractor shall assist the Owner or his liner testing consultant as <br />requested during the performance of quality control testing. <br />1.7 DELIVERY, STORAGE, AND HANDLING <br />A. Packing and Shipping <br />1. Labels on each roll delivered to site shall identify the following. <br />a. Manufacturer's name <br />b. Product Identification <br />c. Thickness <br />d. Roll number <br />e. Batch or lot number <br />f. Panel number (when applicable) <br />g. Roll dimensions <br />2. Contractor shall ensure that geosynthetic rolls are properly loaded <br />and secured to prevent damage during transit. <br />3. Contractor shall protect geosynthetic from excessive heat, cold, <br />puncture, cutting, or other damaging or deleterious conditions. <br />4. Contractor shall ensure personnel responsible for loading, <br />transport, and unloading of geosynthetic are fully aware of the <br />consequences of damage to geosynthetic, and are familiar with <br />handling and transport constraints imposed by Manufacturer. <br />5. Geosynthetic delivered to the project shall be protected by a <br />relatively impermeable and opaque protective cover, with individual <br />straps for unloading. <br />B. Acceptance at Site <br />1. CQA Monitor shall perform inventory and surface inspection for <br />defects and damage of all geosynthetic rolls upon delivery. <br />2. Contractor shall unroll and inspect any geosynthetic roll that may be <br />damaged below surface. <br />3. Contractor shall repair damage resulting from handling and <br />transport of geosynthetics at no additional cost to Rio Grande <br />Silver. If irreparable, in the opinion of Design Engineer, damaged <br />Rio Grande Silver Tailings Evaporation Pond 02620 -5 Geosynthetic Liner <br />August 2011 02620 <br />
The URL can be used to link to this page
Your browser does not support the video tag.