My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-30_REVISION - M1977215 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-08-30_REVISION - M1977215 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:47 PM
Creation date
9/9/2011 7:46:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
8/30/2011
Doc Name
Tailings Pond 2 Evaporation Pond Technical Specifications
From
Rio Grande Silver
To
DRMS
Type & Sequence
TR17
Email Name
RCO
SSS
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Any work found unsatisfactory or any work disturbed by subsequent <br />operations before acceptance is granted shall be corrected by Contractor <br />as directed by the Project Manager at no additional cost to Rio Grande <br />Silver. <br />PART2 PRODUCTS <br />2.1 WATER TRUCK DELIVERY PIPES <br />A. All pipe for the Water Truck Delivery Pipes shall be HDPE SDR32.5 pipe <br />DriscoplexTM 1700 manufactured by CP Chem, or approved equivalent <br />meeting ASTM D 1248 and D 2239 requirements. The resin, pipe, and <br />fittings will comply with the following industry standards: Pipe Standard, <br />ASTM F 714; Fittings Standard, ASTM D 3261; Cell Classification, ASTM <br />3350, PE345434C. <br />B. All valves and fittings shall be stainless steel, rated to a minimum <br />pressure of 50 psi as approved by the Project Manager and /or the Design <br />Engineer. <br />2.2 EVAPORATION POND DIFFUSER <br />A. A pre- fabricated HDPE diffuser shall be installed at the evaporation pond <br />as indicated on the Drawings. <br />PART 3 EXECUTION <br />3.1 GENERAL <br />A. Contractor shall install pipe according to Manufacturer's <br />recommendations. <br />B. Contractor shall take all precautions necessary to not damage the pipe <br />during material placement. Contractor may periodically be requested by <br />the Project Manager to verify that covered pipe has not been crushed. <br />Costs associated with proving pipes that have not been crushed shall be <br />borne by Contractor. <br />C. Piping shall be placed to the lines and elevations shown on the Drawings, <br />with no sags or humps, as approved by the Project Manager and Design <br />Engineer. <br />3.2 PIPE CONNECTIONS <br />A. All connections for non - perforated pipe shall be watertight under <br />maximum anticipated pressure head. <br />B. The ends of all pipes shall be capped with a manufactured pipe cap. <br />C. HDPE pipe will be butt- heat - fusion welded in accordance with the <br />Manufacturer's guidelines. <br />Rio Grande Silver Tailings Evaporation Pond 02610 -2 HDPE Pipe and Fittings <br />August 2011 02610 <br />
The URL can be used to link to this page
Your browser does not support the video tag.