My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-30_REVISION - M1977215 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-08-30_REVISION - M1977215 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:47 PM
Creation date
9/9/2011 7:46:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
8/30/2011
Doc Name
Tailings Pond 2 Evaporation Pond Technical Specifications
From
Rio Grande Silver
To
DRMS
Type & Sequence
TR17
Email Name
RCO
SSS
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2 PAYMENT <br />Engineer. <br />7. Tests will not be the sole basis for determination of whether the fill <br />meets the specification requirements. <br />8. The final acceptance or rejection of the fill will be based on the <br />Design Engineer's opinion considering test results and the general <br />disposition of the fill. <br />9. If the fill is rejected, remove and replace rejected material at no <br />cost to the Owner. <br />3.7 TOLERANCES <br />A. Limits of excavation, berm fill placement, and anchor trench fill are <br />defined by the lines and elevations shown on the Drawings. All fill shall <br />be placed to the minimum thicknesses shown on the Drawings. <br />B. Finished grades shown on the Drawings are given in feet and shall slope <br />uniformly between given spot and contour elevations, without sag or <br />humps. All grades shall provide for natural runoff. <br />C. All grades will be ±0.2 feet, unless approved otherwise by Design <br />Engineer and Project Manager. <br />PART 4 MEASUREMENT AND PAYMENT <br />4.1 MEASUREMENT <br />A. Excavation of borrow areas and anchor trench fill will not be measured for <br />payment. <br />B. Subbase preparation will be measured for payment per square yard <br />installed. <br />C. Berm fill will be measured for payment per cubic yard placed. <br />D. Aggregate base course will be measured for payment per cubic yard <br />placed. <br />A. Compensation to the Contractor for subbase preparation, berm fill and <br />aggregate base course shall be per the unit prices included in the bid <br />schedule. <br />Rio Grande Silver Tailings Evaporation Pond <br />August 2011 <br />END OF SECTION 02320 <br />02320 -7 <br />Earthwork <br />02320 <br />
The URL can be used to link to this page
Your browser does not support the video tag.