My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-30_REVISION - M1977215 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-08-30_REVISION - M1977215 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:47 PM
Creation date
9/9/2011 7:46:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
8/30/2011
Doc Name
Tailings Pond 2 Evaporation Pond Technical Specifications
From
Rio Grande Silver
To
DRMS
Type & Sequence
TR17
Email Name
RCO
SSS
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The types of geosynthetics used in the construction include HDPE liner <br />where used and geotextile. These geosynthetics are defined in the <br />project Specifications. Prior to and during construction, these <br />geosynthetics shall be sampled and tested to determine if they meet <br />project Specifications. All tests shall be performed in a geosynthetics <br />laboratory approved by the Project Manager. <br />B. Prior to geosynthetic installation, the CQA Monitor shall review the <br />Installer's QC submittals to evaluate or confirm that these materials meet <br />project requirements. The CQA Monitor shall review the QC submittals <br />that are outlined in Section 01330: Submittals of the Specifications. <br />C. The CQA Monitor shall monitor and test all geosynthetic components of <br />the construction to verify that the construction is in compliance with the <br />project Specifications. The CQA Monitor shall identify inadequate <br />construction methodologies or materials which may adversely impact the <br />performance of the facility being constructed and existing structures. <br />Visual observations throughout the construction process shall be made to <br />ensure that the materials are placed to the lines and grades as shown on <br />the Drawings. <br />The CQA Monitor shall review the following submittals by the Installer <br />during the project: <br />• Verification that a qualified land surveyor has verified all <br />lines and grades; and <br />• Subgrade surface acceptance certificates for each area to <br />be covered by the lining system, signed by the Installer. <br />The CQA Monitor shall: <br />. Rio Grande Silver Tailings Evaporation Pond <br />August 2011 <br />• Inspect all geosynthetic materials delivered to site. The <br />CQA Monitor shall document any damage and notify the <br />Project Manager; <br />• Obtain geosynthetic packaging identification slips for <br />verification and generation of an on -site materials <br />inventory; <br />• Observe subgrade conditions prior to geosynthetics <br />installation and verify that any deficiencies, as defined in <br />Section 02200 of the Specifications, are corrected; <br />Observe permanent anchoring of geosynthetics to verify <br />that design and project Specifications are met; <br />Observe that required overlap distances are met; <br />Monitor and record ambient air temperatures; <br />01450 -10 Quality Assurance /Quality Control <br />01450 <br />
The URL can be used to link to this page
Your browser does not support the video tag.