2011-08-30_REVISION - M1977215 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-08-30_REVISION - M1977215 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:47 PM
Creation date
9/9/2011 7:46:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
8/30/2011
Doc Name
Tailings Pond 2 Evaporation Pond Technical Specifications
From
Rio Grande Silver
To
DRMS
Type & Sequence
TR17
Email Name
RCO
SSS
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.4 MAINTENANCE OF DOCUMENTS <br />statement that equipment and materials incorporated in the work <br />and workmanship comply with the Contract. <br />A. The Contractor shall maintain one set of contract documents on site. <br />B. Record Documents and samples shall be stored in the Contractor field <br />office apart from documents used for construction. <br />C. Record documents are to be maintained in a clean, dry, and legible <br />condition and shall not be used for construction purposes. <br />D. The Contractor shall keep record documents and samples available for <br />inspection by Rio Grande Silver. <br />3.5 RECORD DOCUMENTS <br />A. The Contractor shall provide and maintain at the project site one <br />complete job set of the Drawings, Shop Drawings, and Specifications in <br />good, clean, and readable condition. The job set Drawings and <br />Specifications shall be available for review at any time by Rio Grande <br />Silver. <br />B. Neatly inscribe on the Drawings, Shop Drawings, and Specifications job <br />set all changes in work. Note changes with red pencil or red ink; Note all <br />data and changes on the job set in sufficient detail and clarity and provide <br />information necessary to prepare accurate Record Drawings. Information <br />shall be recorded concurrently with construction progress. No work shall <br />be concealed or covered in a manner that would prevent inspection until <br />required information is recorded and approved by Rio Grande Silver. <br />Each item of actual construction shall be recorded. If record Drawings are <br />not kept up to date, Rio Grande Silver may recommend retainage be <br />withheld from progress payments. <br />C. Specifications shall be legibly marked and each item of actual <br />construction recorded including the following <br />1. Manufacturer, trade name, and model number of each product <br />actually installed, particularly optional items and substitute items. <br />2. Changes made by addenda and modifications. <br />D. After project completion, submit the original job set of redlined Design <br />Drawings and Specifications signed by the Project Site Superintendent. <br />E. The Contractor shall maintain operation and maintenance information <br />inspection certifications, and field test records required by individual <br />Specifications. <br />Rio Grande Silver Tailings Evaporation Pond <br />Quality Assurance /Quality Control <br />01450 -8 <br />August2011 01450 <br />