My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-30_REVISION - C1982056 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2011-08-30_REVISION - C1982056 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:46 PM
Creation date
9/6/2011 7:58:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
8/30/2011
Doc Name
Adequacy Review
From
DRMS
To
Twentymile Coal Company
Type & Sequence
TR77
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />Demolish and Remove 15LT Structures <br />DEMOLISH <br />16.00 <br />$11,095.61 <br />$3,077.61 <br />$2,414.27 <br />$1,055.62 <br />$622.13 <br />$1,290.87 <br />$2,955.88 <br />Seal 15LT Vent Shaft <br />MINESEAL <br />40.00 <br />Regrade 15LT Vent Shaft Pad <br />DOZER <br />14.04 <br />Regrade 15LT Vent Shaft Access Road <br />DOZER <br />6.14 <br />Backfill 15LT Vent Shaft Cuttings Pit <br />DOZER <br />3.62 <br />Replace topsoil on 15LT pad and access road <br />DOZER <br />7.80 <br />Reseed 15LT Pad and Access Road <br />REVEGE <br />4.60 <br />SUBTOTALS: <br />92.2 <br />$ $22,511.99 <br />Task description: <br />Site: Foidel Creek Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />000 <br />8/30/2011 <br />JDM <br />Agency or organization name' <br />TASK LIST (DIRECT COSTS) <br />Summary of TR -77 Tasks <br />County: Routt <br />COST SUMMA] <br />Permit Action: TR77 <br />State: Colorado <br />DRMS <br />Permit/Job #: C1982056 <br />Abbreviation: None <br />Filename: CO56 -000 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />2.02 Total = <br />1.05 Total = <br />46.10 Total = <br />10.00 Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />0.00 <br />4.25 <br />5.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $8,246.18 <br />TOTAL BOND AMOUNT (direct + indirect) = $30,758.17 <br />CONTINGENCY: 0.00 <br />Total = <br />Total = <br />$454.74 <br />$236.38 <br />$2,699.62 <br />$2,251.20 <br />$5,641.94 <br />$28,153.93 <br />0.00 <br />$1,196.54 <br />$1,407.70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.