Laserfiche WebLink
Month <br />Farm Headgate, ; <br />Diversi into • <br />CRI.Recharge'Pond; <br />/(acre ' <br />' (A)::. ` .:. <br />Lagged Timing •. <br />Full; Heagate <br />- Delhtery <br />(acr fleet) <br />(B) • .. <br />• Summer <br />Retum Fiow <br />Component <br />.(acre- fe :, <br />` =(C) _ , <br />- _Winter <br />Retum ` <br />:., F lo w s <br />( acre •feet) . <br />Timnath- Connell <br />Lagged <br />Depletions <br />`(acre -feet) <br />Monthly Excess <br />or Deficit <br />• Realized at River <br />(acre -feet) <br />Apr -11 <br />50.22 <br />14.09 <br />5.21 <br />1,88 <br />7.00 <br />May -11 <br />42.57 <br />16.73 <br />10.92 <br />2.06 <br />3.75 <br />Jun -11 <br />69.30 <br />20.19 <br />11.55 <br />2.17 <br />6.47 <br />Jul -11 <br />86.70 <br />24.77 <br />14.90 <br />2.53 <br />7.34 <br />Aug - 11 <br />5.00 <br />29.94 <br />13.82 <br />2.78 <br />13.33 <br />Sep <br />5.00 <br />29,13 <br />11.27 <br />2.80 <br />15.06 <br />Oct - 11 <br />2.59 <br />25.86 <br />8.64 <br />2.82 <br />14.40 <br />Nov - 11 <br />0.00 <br />23.10 <br />7.40 <br />2. 54 <br />13 16 <br />Dec - 11 <br />0.00 <br />20.73 <br />6 79 <br />2.27 <br />11.57 <br />Jan - 12 <br />0.00 <br />18.7,2 <br />6.14 <br />2.13 <br />10 44 <br />Feb <br />0.00 <br />17.00 <br />5.56 <br />1 84 <br />9.60 <br />Mar - 12 <br />0.00 <br />15.49 <br />5.02 <br />1.68 <br />8.59 <br />Total <br />261.38 <br />255.75 <br />62.47 <br />44.76 <br />27.80 <br />120.7 <br />Table No. 6 <br />Connell Resources, Inc. <br />Timnath- Connell Pit SWSP <br />Red italics denotes pro <br />RECE V i <br />AUG 23 /Or Prepared By: Applegate Group, Inc. <br />Date Revised: 8/22/2011 <br />AG Job #: 05 -114 <br />Water Ba lance for CRl's SWSP during Water Years 2010 and 2011 <br />(A) Actual and projected recharge diversions <br />(B) Lagged timing of farm headgate delivery realized at the Poudre River in Water Years 2010 and 2011 from recharge model run (Appendix D) <br />(C) Irrigation season retum flow component for the 2.0 Box Elder Ditch shares from Table No. 5 <br />(D) Winter retum flows for the 2.0 shares from Table No. 5 <br />(E) Total combined lagged mining depletions from Water Years 2010 and 2011 <br />(F) Monthly excess or deficit realized at the ever, (B)- (C)- (D) -(E) <br />