Laserfiche WebLink
Table No. 2 <br />Connell Resources, Inc. <br />Timnath - Connell Pit SWSP <br />Operational Losses <br />Total Material Mined = <br />Moisture Content = <br />D.,st Control= <br />200,000 tons <br />ac -ft <br />4.0% <br />0 .8 <br />(A) Average monthly projected production percentages <br />(B) Aggregate production = (A) * Total Material Mined/Year •1 <br />(C) Water retained in product calculated as 4% of aggregate production t- <br />(D) Water used for dust control ` <br />(E) Operational consumptive use = (C) + (D)%, <br />(F) Total lake evaporation from Table No. 1 <br />(G) Total consumptive use, Column (E) + Column (F) •. <br />(H) Lagged depletions from Appendix A <br />(I) Lagged depletions from Appendix B <br />(3) Total lagged depletions, Column (H) + Column (I) 7 <br />N CRI SSPs\Disciphnes (recnn,cal) Wacer Rights'SSPs\Timnatn- Connell PitlTimnath Connell WY 20111SupplyDemand Timnath.Connell SSP- WY2011.xl5 <br />Prepared By: Applegate Group, Inc. <br />Date Revised: 6/16/2011 <br />AG Job #: 05 -114 <br />(A) (B) (C) (D) (E) (F) (G) <br />(H) <br />• Month <br />Percent of <br />Annual <br />Aggregate <br />Production <br />Aggregate <br />Production <br />(tons) <br />Water <br />Retained <br />in Product <br />(ac-ft) <br />Water Used <br />'For Dust. <br />.Control <br />(ac -ft) <br />Operational <br />Consumptive <br />Use <br />(ac-ft) <br />Evaporative <br />Consumptive <br />Use <br />(ac-ft) <br />Timnath- Connell <br />Consumptive <br />Use <br />(ac-ft) • <br />Timnath - Connell <br />Lagged <br />Depletions <br />(ac-ft) <br />Apr -11 <br />9.0% <br />18,000 <br />0.53 <br />0.07 <br />0.60 <br />1.56 <br />2.17 <br />1.88 <br />May -11 <br />13.0% <br />26,000 <br />0.77 <br />0.10 <br />0.87 <br />1.91 <br />2.78 <br />2.06 <br />Jun -11 <br />16.0% <br />32,000 <br />0.94 <br />0.13 <br />1.07 <br />2.82 <br />3.89 <br />2.17 <br />Jul -11 <br />17.0% <br />34,000 <br />1.00 <br />0.14 <br />1.14 <br />3.19 <br />4.33 <br />2.53 <br />Aug -11 <br />15.0% <br />30,000 <br />0.88 <br />0.12 <br />1.00 <br />2.91 <br />3.91 <br />2.78 <br />Sep -11 <br />9.0% <br />18,000 <br />0.53 <br />0.07 <br />0.60 <br />2.09 <br />2.69 <br />2.80 <br />Oct -11 <br />7.0% <br />14,000 <br />0.41 <br />0.06 <br />0.47 <br />1.34 <br />1.80 <br />2.82 <br />Nov -11 <br />4.0% <br />8,000 <br />0.24 <br />0.03 <br />0.27 <br />0.76 <br />1.03 <br />2.54 t <br />Dec -11 <br />1.0% <br />2,000 <br />0.06 <br />0.01 <br />0.07 <br />0.60 <br />0.67 <br />2.37 <br />Jan -12 <br />1.0% <br />2,000 <br />0.06 <br />0.01 <br />0.07 <br />0.60 <br />0.66 <br />2.13 <br />Feb -12 <br />2.0% <br />4,000 <br />0.12 <br />0.02 <br />0.13 <br />0.75 <br />0.88 <br />1.84 <br />Mar -12 <br />6.0% <br />12,000 <br />0.35 <br />0.05 <br />0.40 <br />0.94 <br />1.35 <br />1.88 <br />Total <br />100% <br />200,000 <br />5.9 <br />0.8 <br />6.7 <br />19.5 <br />26.2' <br />27.8 <br />Table No. 2 <br />Connell Resources, Inc. <br />Timnath - Connell Pit SWSP <br />Operational Losses <br />Total Material Mined = <br />Moisture Content = <br />D.,st Control= <br />200,000 tons <br />ac -ft <br />4.0% <br />0 .8 <br />(A) Average monthly projected production percentages <br />(B) Aggregate production = (A) * Total Material Mined/Year •1 <br />(C) Water retained in product calculated as 4% of aggregate production t- <br />(D) Water used for dust control ` <br />(E) Operational consumptive use = (C) + (D)%, <br />(F) Total lake evaporation from Table No. 1 <br />(G) Total consumptive use, Column (E) + Column (F) •. <br />(H) Lagged depletions from Appendix A <br />(I) Lagged depletions from Appendix B <br />(3) Total lagged depletions, Column (H) + Column (I) 7 <br />N CRI SSPs\Disciphnes (recnn,cal) Wacer Rights'SSPs\Timnatn- Connell PitlTimnath Connell WY 20111SupplyDemand Timnath.Connell SSP- WY2011.xl5 <br />Prepared By: Applegate Group, Inc. <br />Date Revised: 6/16/2011 <br />AG Job #: 05 -114 <br />