Laserfiche WebLink
Truck/loader team -Truck : <br />- Loader :CAT <br />Cat 725 <br />962G <br />Support equipment -Load area : <br />-Dump area : <br />NA <br />Cat D5G LGP - 5P <br />Road maintenance -Motor grader :NA <br />-Water truck • <br />NA <br />Cost Breakdown : <br />Truck/Loader <br />Truck <br />Work Team <br />Loading Tool <br />Support Equipment <br />Load Area <br />Dump Area <br />Road Maintenance <br />Motor Grader <br />Equipment <br />Water Truck <br />Import data filename : <br />truck2 <br />loader <br />NA <br />dozer <br />NA <br />NA <br />% Utilization- machine : <br />100 <br />87 <br />NA <br />90 <br />NA <br />NA <br />- Ripper attachment : <br />NA <br />NA <br />NA <br />15 <br />NA <br />NA <br />Ownership cost/hour : <br />$38.15 <br />$21.66 <br />NA <br />$13.67 <br />NA <br />NA <br />Operating cost/hour : <br />$35.86 <br />$21.59 <br />NA <br />$19.06 <br />NA <br />NA <br />Ripper op. cost/hour : <br />NA <br />NA <br />NA <br />$0.31 <br />NA <br />NA <br />Operator cost/hour : <br />$21.72 <br />$31.83 <br />NA <br />$31.83 <br />NA <br />NA <br />Unit subtotals : <br />Number of units : <br />$95.72 <br />$75.08 <br />NA <br />$64.86 <br />NA <br />NA <br />2 <br />1 <br />0 <br />1 <br />0 <br />0 <br />Group subtotals : <br />Work : $266.52 <br />Support : $64.86 <br />Maintenance : $0.00 <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task # : 002 State : Colorado <br />Date : 05/21/2004 County :Park <br />User : AJW Site : Colorado <br />Permit or other job action :AM -02 <br />Task description :Replace Topsoil <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />HOURLY EQUIPMENT COST <br />Equipment Description <br />MATERIAL QUANTITIES <br />Initial <br />volume : 11,535 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : <br />Material weight : <br />Descr. : Top soil <br />Rated payload : <br />Payload capacity : <br />BCY <br />Source of quantity take -off :pg 76 <br />Source of estimated swell factor :pg 76 <br />Material purchase cost : $0.00 <br />1,600 <br />Loadinq Tool Capacity : <br />Rated capacity (nom. heaped) : 4.000 LCY <br />Descr. : Other - moist loam (100 -110% ) <br />Bucket fill factor : 1.050 <br />Adjusted bucket capacity : 4.200 LCY <br />Swell <br />factor : <br />pounds /LCY <br />/LCY <br />50,000 pounds <br />31.25 LCY <br />Final truck volume based on number of loader passes : <br />• truck volume adjusted to not exceed rated payload or heaped volume <br />Job Condition Corrections : <br />Permit/job # : M -1985 -029 <br />Abbreviation :none <br />Filename :MO29 -002 <br />Shift basis : <br />Total cost : <br />Truck Bed (volume) Basis : <br />Struck volume : <br />Heaped volume : <br />Average volume : <br />Adjusted volume *: <br />1 per day <br />Total work team cost/hour : $331.39 <br />Loose <br />1.429 volume : 16,479 LCY <br />$0 <br />13.60 <br />17.80 <br />15.70 <br />17.80 <br />16.80 <br />sheet 1 of 2 <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />Altitude adj. : <br />Job efficiency : <br />Net correction : <br />Truck <br />1.000 <br />0.830 <br />0.830 <br />Loader <br />1.000 <br />0.830 <br />0.830 <br />Site altitude (ft.) : 10,350 <br />Source <br />(Cat HB) <br />(1 shift/day) <br />