Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 05/21/2004 <br />User : AJW <br />Agency or organization name :DMG <br />Permit or other job action :AM -02 <br />Task description :re -grade spoils <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />...................................... ............................... <br />..................................... ............................... <br />...................................... ............................... <br />..................................... ............................... <br />...................................... ............................... <br />..................................... ............................... <br />...................................... ............................... <br />..................................... ............................... <br />...................................... ............................... <br />..................................... ............................... <br />...................................... ............................... <br />..................................... ............................... <br />...................................... ............................... <br />..................................... ............................... <br />MATERIAL QUANTITIES <br />Initial <br />volume : 78,000 <br />LCY <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Average push distance : 150 feet <br />Unadjusted hourly production : 685.7 LCY /hr <br />Material consistency description : <br />Loose stockpile <br />Average push gradient : 2.00 % (pos) <br />Average site altitude : 10,350 feet <br />Material weight : <br />Weight description : <br />Gravel - Dry (1 /4 "2'diam.) <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County :Park <br />Site :Alma Placer <br />Basic machine <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Source of estimated volume :AM -02 rec cost est <br />2,850 lbs/LCY <br />1 Dozer(s) <br />$0.442 /LCY <br />Swell <br />factor : <br />:Cat D8R Series II - 8U <br />:Universal <br />:ROPS Cab <br />:3 -shank ripper <br />$50.09 <br />$50.04 <br />$1.05 <br />$31.83 <br />$133.02 <br />NA <br />Permit/job# :M- 1985 -029 <br />Abbreviation :none <br />Filename :MO29 -001 <br />Utilization % <br />NA <br />75 <br />15 <br />NA <br />Loose <br />volume : <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency : <br />Horsepower : 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : <br />78,000 LCY <br />$133.02 <br />Dozing method : <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />Net correction : <br />Source <br />1.00 (excl.) <br />1.20 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (1shift/day) <br />0.60 (fnd -sf) <br />0.97 (Cat HB) <br />0.94 (Cat HB) <br />0.81 (Cat HB) <br />1.00 (S /SU /U) <br />0.44 <br />Adjusted unit production : 301.26 LCY /hr <br />Adjusted fleet production : 301.26 LCY /hr <br />Total job time : <br />Total job cost : <br />258.91 Hours <br />$34,440 <br />