Laserfiche WebLink
• <br />• <br />• <br />Exhibit N - AMENDMENT 4 <br />Source of Legal Right to Enter <br />Most of the land to be mined in Phase 7 is owned by Valco, Inc. and leased by the operator as <br />those provided for Amendment 1, 2 and 3. No amendments to the leases have been made; therefore <br />this exhibit refers to previously submitted information. Those leases provide the legal right to enter <br />for Amendment 4. <br />The easterly 17 acres on the Phase 7 area is owned by Transit Mix of Pueblo and it was added into the <br />permit area in a previous amendment. That ownership documentation was provided in the previous <br />amendment. <br />The off -site drainage channel area is owned by Mountain States Sheet Metal Corporation and is a <br />dedicated easement contained within a platted subdivision called Brown Subdivision. The following <br />page is a copy of the right to enter authorization. <br />