Laserfiche WebLink
Various Permits and Licenses <br />permit <br />Obtained <br />Applied <br />. for <br />Not <br />needed <br />Comments <br />Effluent Discharge <br />and Stormwater <br />XX <br />Permit will be modified to include a new discharge point. <br />Air Quality <br />XX <br />The site permit will be modified to include the Phase 7 area. All <br />equipment is permitted. <br />Radioactive Source <br />XX <br />No radioactive materials to be used. <br />404 (US Corps of <br />Engineers) <br />XX <br />Section 404 Nationwide permit for Phase 7. The NW permit <br />approval will be obtained prior to affecting jurisdictional wetlands. <br />Dam Permits <br />XX <br />No dams will be constructed. <br />Well Permits <br />XX <br />A well permit for the Phase 7 mining will be submitted. The <br />Substitute Water Supply Plan is pending and will be amended to <br />include the exposed groundwater during mining. <br />Highway Access <br />XX <br />Uses same access as the concrete batch plant. <br />USFS & BLM <br />Permits <br />XX <br />No federal land involved. <br />Pueblo County Land <br />Use <br />XX <br />The approved SUP 596 and 2004 -014 includes this land. A <br />floodplain hazard development permit will be obtained. <br />• <br />• <br />Exhibit M - AMENDMENT 4 <br />Other Permits and Licenses <br />• <br />