Laserfiche WebLink
35 <br />30 <br />25 <br />5 <br />0 <br />• <br />Figure G -2 <br />Transit Mix - Pueblo East Pit - Monitoring Well Saturated Thickness <br />Please 1 Lie atetin <br />P ast 2 DeWa -riixg <br />ti�~ ^ \� \ �O O � 'ti \� \ �O O � ^ \� \�O 1 \� \ �O Ob ^ \� \�O ti \1 \ �O Oh ^ \� \�O ��~ OO � OO � <br />.BBA <br />w:uer consult ants 11 (SHOP ROGD EN <br />ASSOCIATES. INC. <br />• <br />1 \� \B ^ \ ~ \B <br />6 <br />• <br />t MW -I <br />MW -2 <br />- MW -3 <br />CIF— MW-4 <br />•■.1F. MW-5 <br />MW -6 <br />•■••t■.... MW-7 <br />MW-8 <br />—MW -9 <br />t MW -101 <br />MW 102 <br />—MW -103 <br />MW -I05 <br />M W -I0 <br />Note: Water level measuring points for MW- 101,102,103 and 105 assumed to <br />be the same elevation as MW -1,2,3 and 5. Further clarification may be needed. <br />Pit was flooded in July and August 2006. <br />Recharge to recharge pit in May 2006 <br />H: \9107 - Transit Mix \07 - Pueblo East \Monitoring data Phase 1 and 2 \Water Level Monitoring worksheet (Jan08 to Mar09) v2.xls <br />Printed On: 6/2/2011 P18 <br />