Laserfiche WebLink
August 25,2011 C-1994-082/Yoast Mine SLB <br /> Ponds 010, 012 and 012A,013,and 014 all held water. <br /> SLIDES and DAMAGE-Rule 4.12: <br /> An excavator and bulldozer were working in the Pond 012 slide area,covering the north trench drain to <br /> buttress the toe of the slide. The trench drains installed along the toe and beneath YPM 6-3 were both flowing. <br /> The operator indicated that the slide slope above Pond 012 would be hydroseeded this fall. It is suggested that, <br /> consistent with the plan outlined in Attachment 13-12B of the permit application, SCC wait until the area <br /> stabilizes. The permit specifically allows SCC to wait until Northwest Colorado Consultants(NWCC)has <br /> determined that the slope has been stabilized. Since there was considerable movement in this area this past Spring, <br /> it would be best to give it one more season and then have NWCC reevaluate the area. <br /> TOPSOIL—Rule 4.0611[]Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; <br /> Redistribution 4.06.4: <br /> Topsoil was being redistributed on the reclaimed corridor of Haul Road A, immediately east of Pond 010 <br /> where rock had been stored. The replacement depth was approximately 9", and the area was roughly 150' x 50'. <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 3 of 6 <br />