My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-04-14_PERMIT FILE - M2006024
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2006024
>
2006-04-14_PERMIT FILE - M2006024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:25 PM
Creation date
8/29/2011 7:24:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006024
IBM Index Class Name
PERMIT FILE
Doc Date
4/14/2006
Doc Name
Response- FAX
From
Stephanie and Ray Sikes
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br />I- HX NU. : <br />Hpr. 14 2bbb bb: 45HM H4 <br />(1)This application includes the following information in Accordance with the regulations <br />RULE 3. <br />(a)When and what depth of overburden will be replaced in relation to extraction The <br />soil types present have little to no topsoil and some overburden with the surface being Loam. <br />3" to 6" of the top layer will be saved as plant growth media to be replaced in .reclamation, <br />(b)Maximum gradient of reclaimed slopcs(horizontal :vertical) The maximum gradient <br />on reclaimed backslopes will be 3H: 1V of flatter to accommodate the rangeland use proposed by <br />the owner. <br />(e)Measures that will be taken to tevegetate the site: <br />(i)The growth media will be replaced at n depth of 3 "to6" and the backslopes finished at. <br />3H:1 V. The quarry will be daylight to the South side. See map. <br />(ii)Time of seeding, seedbed preparation, type,appplicalion rate and soil incorporation. <br />method of fertilization application. Fall seeding is preferred and proposed if at all possible. <br />Reshaping will be done using the saved topsoil of 3" to 6" all the slopes shall be at no greater <br />than 3 H-1 V. The topsoil will be spread and smoothed but not hard packed. Seed will be <br />broadcast. Seeding rates as follows per NRCS. <br />Western Wheatgrass 32 pls(4)100% of mix 50% l6pls /ac 10 acres =160 lbs. required <br />Blue Gramma 6p1s(ai100 % ofmiix 20% 1.2pls/ac 10acres 12lbs:required <br />• SideOats Gramma Kpla 100% of mix 20°J 1.6pls/ac l0aeres= 16 lbs. required <br />Saud Dropseed l0U% of mix 5% 0.1pls/ac 10acres= 1 lbs, required <br />Winter Fat 1pls(J 100% of mix 5% 0.1p1s /ac 10 acres= 1 lbs. required <br />40# available N & P is the recommended and will he applied with a commercial spreader. <br />Certified noxious weed free straw or grass hay will be applied at the rate of 4,000 ii/A. <br />Any noxious weeds will be treated as recommended by the N.R.S.C. Springfield office <br />(iii)State the species to be planted and applicable quantities. <br />See above for grass seed mixture, No forbs, shrubs or Lives will be planted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.