Laserfiche WebLink
F RUM : <br />Carrizo Stone <br />(g)No new roads will be necessary and no improvements on existing roads are needed <br />Existing ranch roads are 16 to 20 feet in width. There are no new or improved roads to be <br />permitted as part of the permitted acreage. There will be no associated drainage or runoff <br />conveyance structures to be built with this operation. All drainage will be away from the <br />quarry <br />(h)No water for processing material or dust control is needed. Sanitary water will not <br />be used or needed Porta - John Toilets to be used. Drinking water will be bottled and imported <br />to the site daily when people are working. <br />(i)No grrnrndwater will be encountered and/or surface water intercepted or disturbed. <br />All Seel storage containers will have containment structures. <br />FAX NU. : <br />EXHIBIT C (Continued, Page 2) <br />(jThe historical flows of ctormwater will not be affected. <br />(p)No blasting will be used on this site. <br />Hpr. 14 abbb Ub:44HM <br />(k)Nu refuse or acid and toxic producing materials will be exposed during mining so no <br />plan is needed. If any refuse is encountered it. will be deposited of off -site in an approved <br />landfill. <br />(l)This operation is designed to provide for a stable configuration of the reclaimed area <br />to be used for grazing. <br />( m)The stone is proposed to be processed utrsile to be used fur construction uses by <br />Carrizo Stone, L.L.C. <br />(n)The primary commodity to be mined will be sandstone for construction use. There <br />are no known secondary commodities involved. <br />(n)There are no known incidental products to be mined by this proposed operation. <br />If any incidental products are discovered, the Division will be duly notified. Any waste rock on <br />the area will be used to fill the highwall between 3 to 1 and 5 to 1 slope. — <br />