Laserfiche WebLink
August 18, 2011 C-1981-018/Deserado Mine JRS <br /> SUPPORT FACILITIES (cont.)-The loadout structure was stable at the time of the inspection. There was a <br /> small pile of coal on the outside(south)of the tracks that will need to be cleaned up. BME was doing some work <br /> on the rail loop but there was no mine-related disturbance or work being conducted. <br /> -The area of the nitrogen injection facility and rock dust tank 3 was stable at the time of the inspection. <br /> -The cement borehole(into the workings)and the underground fuel storage area was stable at the time of the <br /> inspection. As stated in"OTHER"above,there were no signs of any water or leaking fuel within this containment <br /> berm. <br /> DOCUMENTS RECEIVED:None <br /> This concludes the 18 August 2011 inspection report for the Deserado Mine. <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 7 of 22 <br />