My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-23_REVISION - M1999006 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999006
>
2011-08-23_REVISION - M1999006 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:52 PM
Creation date
8/25/2011 1:25:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999006
IBM Index Class Name
REVISION
Doc Date
8/23/2011
Doc Name
FW Calculation
From
DRMS
To
Varra Companies, Inc.
Type & Sequence
TR3
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />(min) <br />1 <br />300.00 <br />0.00 <br />3.00 <br />3.00 <br />2983 <br />0.708 <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fPm) <br />Travel <br />(min) <br />1 <br />300.00 <br />0.00 <br />3.00 <br />3.00 <br />3569 <br />0.300 <br />Truck/Loader Worksheet Cont'd <br />• <br />Loading Tool unit <br />Production 828.59 LCY/Hour <br />Truck Unit Production <br />507.98 LCY/Hour <br />• <br />Optimal No. of Trucks: 2 Truck(s) <br />Task # 011 <br />Haul Time: <br />Return Time: <br />0.708 <br />0.300 <br />Total Truck Cycle Time: 5.448 <br />Unit cost: $1.317 /LCY Total job cost: $2,548.83 <br />minutes <br />minutes <br />minutes <br />Adjusted for job efficiency: 687.73 LCY/Hour <br />Adjusted for job efficiency: 421.63 LCY /Hour <br />Selected Number of Trucks: 2 Truck(s) <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 2.82 Hours <br />Page 3 of 3 <br />Adjusted hourly truck team production: 843.25 LCY/Hour <br />Adjusted single truck/loader team production: 687.73 LCY/Hour <br />Adjusted multiple truck/loader team production: 687.73 LCY/Hour <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.