Laserfiche WebLink
Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />NA <br />NA <br />(Cat HB) <br />Stockpile: <br />NA <br />NA <br />(Cat HB) <br />Truck Ownership: <br />NA <br />NA <br />(Cat HB) <br />Operation: <br />NA <br />NA <br />(Cat HB) <br />Dump Target: <br />NA <br />NA <br />(Cat HB) <br />Truck/Loader Worksheet Cont'd <br />Truck Bed (volume) Basis: <br />Struck Volume: 33.80 LCY <br />Heaped Volume: 45.90 LCY <br />Average Volume: 39.85 LCY <br />Adjusted Volume: 45.90 LCY <br />Loading Tool Capacity <br />Rated Capacity: <br />Bucket Fill Factor: <br />Adjusted Capacity: <br />Job Condition Corrections: <br />Net Correction: <br />Final Truck Volume Based on Number of Loader Passes: <br />0.830 <br />7.500 <br />1.025 <br />7.688 <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA <br />LCY (heaped) <br />Bank Clay; Earth (100 % -105 %) 1.025 <br />LCY <br />0.830 <br />Number of Loading Tool Passes Required to Fill Truck: <br />Loading Tool Cycle Time: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Maneuver: NA <br />Task # 011 Page 2 of 3 <br />Bucket Size Class: NA <br />Site Altitude (ft.): 4800 feet <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />46.13 LCY <br />Dump: 0.100 <br />6 passes <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): NA minutes <br />NA <br />0.440 <br />2.640 <br />minutes <br />minutes <br />minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.70 Minutes Adjusted for site altitude: 0.700 Minutes <br />Truck Load Time: 2.640 Minutes Adjusted for site altitude: 2.640 Minutes <br />Truck Maneuver and Dump Time: 1.10 Minutes Adjusted for site altitude: 1.100 Minutes <br />Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, <br />maintained 3.0 <br />CIRCES Cost Estimating Software <br />