My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-23_REVISION - M1999006 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999006
>
2011-08-23_REVISION - M1999006 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:52 PM
Creation date
8/25/2011 1:25:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999006
IBM Index Class Name
REVISION
Doc Date
8/23/2011
Doc Name
FW Calculation
From
DRMS
To
Varra Companies, Inc.
Type & Sequence
TR3
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time Factors Loading Condition Description <br />Factor (min.) <br />Source <br />Material :NA <br />NA <br />NA <br />Stockpile :NA <br />NA <br />NA <br />Truck ownership :NA <br />NA <br />NA <br />Operation :NA <br />NA <br />NA <br />Dump target :NA <br />NA <br />NA <br />Road <br />segment# <br />Haul distance <br />(feet) <br />Grade <br />res. ( %) <br />Rolling <br />res. ( %) <br />Total <br />resistance ( %) <br />Speed <br />(feet/minute) <br />Travel time * <br />(minutes) <br />1 <br />600 <br />0.00 <br />3.00 <br />3.00 <br />2983 <br />0.714 <br />Truck/Loader Team Work cont'd Task # : 007 <br />Loading Tool Cycle Time : Number of loading tool passes required to fill truck : <br />Excavators and front shovels - machine cycle time vs. job condition rating : AVERAGE <br />- selected value within basic rating : AVERAGE <br />Track loaders - material descr. :NA <br />- cycle time elements (min.) : Load : NA Maneuver : NA <br />Return route : <br />1 <br />sheet 2 of 2 <br />passes <br />Dump: 0.100 <br />Wheel and track loaders - unadjusted basic loader cycle time ( load, maneuver, and dun4 NA minutes <br />Net cycle time adjustment : <br />Adjusted loader cycle time (total time per loader pass) : <br />Net load time per truck *: <br />Truck Cycle Time : ` bulk of 1st loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />Truck exchange time **: 0.70 minutes Adjusted for site altitude : 0.700 minutes <br />Truck load time: 1.860 minutes Adjusted for site altitude : 1.860 minutes <br />Truck maneuver and dump time: 1.10 minutes Adjusted for site altitude : 1.100 minutes <br />•• set at 0 it exchange time < adj. loader cycle time (truck exchange completed during 1st loader cycle) <br />Truck travel (haul & return) time: Road condition :Firm, smooth, rolling, dirt/It. surfaced, watered, maintained <br />Haul route : <br />• travel time shown for each segment includes acceleration/deceleration adjustment <br />**total haul and return time shown includes altitude adjustment <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) <br />Unit cost : $1.217 /LCY <br />Haul time** : <br />Return time * *: <br />NA <br />0.440 <br />1.860 <br />0.714 <br />600 <br />0.00 <br />3.00 <br />3.00 <br />3569 <br />0.385 <br />Total job cost : $10,601 <br />minutes <br />minutes <br />minutes <br />minutes <br />0.385 minutes <br />Total truck cycle time : 4.759 minutes <br />Loading tool unit production : 900.88 LCY /hour Adjusted for job efficiency : 747.73 LCY /hour <br />Truck unit production : 484.66 LCY /hour Adjusted for job efficiency : 402.27 LCY /hour <br />Optimal no. trucks /loading tool : 2 trucks Selected no. trucks /loader : 2 trucks <br />Adjusted hourly truck team production : 804.53 LCY /hr <br />Adjusted hourly single truck/loader team production : 747.73 LCY /hr <br />Adjusted hourly multiple truck/loader team production : 747.73 LCY /hr <br />Total job time : 11.65 Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.