My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-23_REVISION - M1999006 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999006
>
2011-08-23_REVISION - M1999006 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:52 PM
Creation date
8/25/2011 1:25:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999006
IBM Index Class Name
REVISION
Doc Date
8/23/2011
Doc Name
FW Calculation
From
DRMS
To
Varra Companies, Inc.
Type & Sequence
TR3
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/loader team -Truck :Cat <br />- Loader :CAT <br />773D (2002) <br />5090E <br />Support equipment -Load area :NA <br />-Dump area : <br />Cat D6R - 6S (2003) <br />Road maintenance -Motor grader : <br />-Water truck : Water <br />CAT 14H <br />Tanker, 3,500 Gat. <br />Cost Breakdown : <br />Truck/Loader <br />Truck <br />Work Team <br />Loading Tool <br />Support Equipment <br />Load Area <br />Dump Area <br />Road Maintenance <br />Motor Grader <br />Equipment <br />Water Truck <br />Import data filename : <br />truck2 <br />shovel <br />NA <br />dozer <br />grader <br />misctruk <br />% Utilization- machine : <br />93 <br />100 <br />NA <br />100 <br />50 <br />50 <br />- Ripper attachment : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour : <br />$63.47 <br />$85.96 <br />NA <br />$24.86 <br />$41.68 <br />$11.98 <br />Operating cost/hour : <br />$88.27 <br />$158.57 <br />NA <br />$40.27 <br />$24.30 <br />$12.16 <br />Ripper op. cost/hour : <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />NA <br />Operator cost/hour : <br />$25.88 <br />$38.72 <br />NA <br />$38.54 <br />$38.91 <br />$38.70 <br />Unit subtotals : <br />Number of units : <br />$177.62 <br />$283.25 <br />NA <br />$103.66 <br />$104.89 <br />$62.83 <br />2 <br />1 <br />0 <br />1 <br />1 <br />1 <br />Group subtotals : <br />Work : $638.50 <br />Support : $103.66 <br />Maintenance : $167.72 <br />PROJECT IDENTIFICATION <br />Task # : <br />Date : <br />User: <br />Permit or other job action :Bond Estimate <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Initial <br />volume : 8,712 <br />Agency or organization name :DRMS <br />007 State : Colorado <br />10/22/2009 County : Weld <br />MAC <br />LCY <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : <br />Material weight : 1,600 <br />Descr. : Top Soil <br />Rated payload : 108,060 <br />Payload capacity : 67.54 <br />Loading Tool Capacity : <br />Rated capacity (nom. heaped) : 7.500 LCY <br />Descr. : Bank Clay; Earth (100% -105 %) <br />Bucket fill factor : 1.025 <br />Adjusted bucket capacity : 7.687 LCY <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />Site :Kurtz Resource Recovery <br />Task description :Replacing Topsoil - Tract D <br />Equipment Description <br />Swell <br />factor : <br />Total work team cost/hour : $909.89 <br />NA <br />Source of quantity take -off :Revised Reclamation Estimate (Spreadsheet) <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />pounds/LCY <br />pounds <br />LCY <br />Final truck volume based on number of loader passes : <br />'truck volume adjusted to not exceed rated payload or heaped volume <br />Truck Bed (volume) Basis : <br />Struck volume : <br />Heaped volume : <br />Average volume : <br />Adjusted volume *: <br />Job Condition Corrections : <br />Shift basis : 1 per day <br />Permit/job # :M- 1999 -006 . <br />Abbreviation :none <br />Filename :M006 -007 <br />Truck <br />Altitude adj.: 1.000 <br />Job efficiency : 0.830 <br />Net correction <br />Loose <br />volume : 8,712 LCY <br />33.80 <br />45.90 <br />39.85 <br />45.90 <br />38.44 <br />Site altitude (ft.) : <br />Loader <br />1.000 <br />0.830 <br />0.830 0.830 <br />sheet 1 of 2 <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />4,800 <br />Source <br />(Cat HB) <br />(1 shift/day) <br />
The URL can be used to link to this page
Your browser does not support the video tag.