Laserfiche WebLink
i <br />4 (FORM 2 - Public filing) <br />I I . Describe proposed surface excavation or other land disturbance. including roads. pits. trenches. waste piles. drill pads and <br />collar areas of underground workings. ponds. etc... <br />Surface excavation limited to on -site disposal of sludge material from existing settling pond. Material will be <br />tested for metals toxicity and acid base potential; Material will be mixed with lime for neutralization and <br />in- the - existing -dump and-eevered owed-fron' existing-- - <br />exposed native site material. The trench may be lined or covered with PVC or LDPE liner if it is determined <br />that leaching into the existing dump material would result in degradation of the background environment. <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location. etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 0 Average Width 0.00 (fl) Average Length 0.00 <br />B. Drill Holes: Quantity 0.00 Depth 0.00 (ft) Diameter 0_00 (in) <br />C. Mud Pits: Quantity 0.00 Average Width 0.00 (ft) Average Length 0.00 I ft) <br />Average Depth 0.00 (ft) <br />Described proposed underground work. including reopening of old workings. advancement of adits or shafts. <br />trenches, pits, cuts, rock dumps, or other types of disturbance. describe type. quantity and general dimensions: <br />Underground work will consist of re- entering an open edit and investigating the source of water (15 to 20 gpm) flowing <br />locations for final project ciosure,if necessary. Hand channel sampling will be conducted on exposed structures to verify <br />existing resource'information. I grf siting - R determined to be a probable iiia method of shutting off the source of <br />underground _water..then_a.groutitg.plan will be developed. and. submitted to the.Division for approval. <br />F. Other Disturbances (please describe): <br />No other disturbances are anticipated at this time other than repair of existing structures <br />and general site clean -up of past mining operation debris. <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />Ql el fuel -X00! gallon tank. with weather protection roof and full containment tankyltill. <br />supply portable generator or may be utilized for fuel storage. Tank will be re- supplied by fuel <br />cell mounted in a pick -up truck containing less than 10b gallons of dieseffuei. Grouting <br />rnaterials grouting program - wilt - be determined at time - the groutingprogramis <br />F. New Road(s): Length _ (ft) Width (ft) <br />Significantly Upgraded Road(s) Length (fl) Width (II) <br />Are culverts or other crossings proposed? If so. please describe: <br />The project will utilize existing site roads. No new roads will be constructed. <br />