Laserfiche WebLink
1. LOCATION MAP: Attach.a USGS 7.5 minute quad, or similar map of adequate scale, which locates the prospecting <br />site(s). <br />J. Are prospect sites (e.g.. drill holes. trench locations. etc...) staked on the ground? Yes , No <br />K. Specify the Land Management Agency, Address and Telephone Number: <br />L. The prospector is required to document that the NOI has been sent to the BLM or the USFS. Processing of the NOl will <br />not begin until the prospector has submitted evidence acceptable to the Division that the NOl was sent to the BLivl or <br />USFS. Check one: <br />II. MAPS & DRAWINGS <br />Evidence of notification is attached to this N01 for BLM Land <br />Evidence of notification is attached to this NOI for USFS Land. <br />Other proof of notice is attached to this NOI <br />Accurate topographic base map showing the location of the proposed project must be submitted with this notice. The prospector <br />may submit a U.S.G.S. 7.5 minute quadrangle, or similar map of adequate scale that: <br />3. identifies the proposed prospecting site(s) or activity areas involving surface disturbance. Activity areas include all drill holes. <br />mud pits, excavations, trenches. edits. shafts, tunnels, rock dumps, stockpiles, impoundments and prospecting roads, and <br />4. includes sufficient detail to identify and locate known prospecting features and facilities that may he affected and those that <br />are not anticipated to be affected. This includes the location of all drill holes, mud pits, excavations, trenches, adits, shafts, <br />tunnels, rock dumps. stockpiles, impoundments and prospecting roads. Color photographs, adequately labeled (including <br />date, orientation and location), of the prospecting site may be used to fulfill this requirement if included with the NOI <br />submittal. <br />III PROJECT DESCRIPTION <br />7. Mineral(s) and /or Resource(s) being Investigated: gold, silver, copper, lead, zinc <br />8. Estimated dates of commencement and completion: <br />Commencement: 09/01 /2011 <br />Completion: <br />0.00 <br />9. Amount of material to be extracted, moved or proposed to be moved: <br />10. Identify the type or method of prospecting proposed and quantity (place an "X ") <br />Cuts Pits Trenches <br />shafts Tunnels , Adits Declines <br />_fir Drilling � LFluid Drilling rl,, lling & Blasting <br />09/01/2012 <br />3 (FORM 2 - Public filing) <br />