Laserfiche WebLink
August 16, 2011 <br />C- 1982- 056/Foidel Creek Mine <br />JDM <br />- Topsoil stockpile #1 on the 18RT shaft access road has been consolidated into topsoil stockpile #2. Map 29 will <br />need revised. <br />- The large topsoil stockpile just west of the 6MN pad is not delineated on Map 29. <br />- The topsoil stockpile at the pump house east of Pond F is not delineated on Map 29. <br />- Topsoil stockpiles SPSP 1 and 2 have been consolidated with stockpile SF -4. <br />- Stockpile SF -5 needs required topsoil marker. <br />- Two stockpiles were located on the east and west side of the access road to Pond A just east of the BOB areas <br />were not found on Map 29. <br />- SF -11 needs approved marker. <br />- SF -5 needs approved marker. <br />- Unnamed stockpile north of Pond E on the west side of the access road is not found on Map 29. <br />Topsoil depths were taken at the reclaimed bleeder shaft off of CR33 and at the reclaimed 18RT vent shaft. A <br />total of 6 holes were excavated with topsoil cover estimated to be 10" - 12" with no less than 10" of topsoil cover <br />evident. These locations continue to be stable with no evidence of erosion. <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 3 of 4 <br />