Laserfiche WebLink
DEFECT <br />NO. <br />DEFECT <br />DATE <br />SEAM, PANEL NO. <br />DESCRIPTION OF DEFECT LOCATION <br />DEFECT <br />PE <br />DEFECT REPAIR <br />DEFECT VACUUM TEST <br />REMARKS <br />REPAIR <br />DATE <br />TIME <br />SIZE <br />TYPE <br />WELD <br />TECH <br />MACH <br /># <br />TEST <br />DATE <br />TECH <br />ID. <br />QA <br />MONITOR <br />P/F <br />D -1678 <br />10/15/10 <br />P545/P673 <br />NEEOS <br />FVT <br />10/15/10 <br />16:53 <br />1x1 <br />P <br />DL <br />117 <br />10/15/10 <br />RM <br />BM <br />P <br />D -1679 <br />10/16/10 <br />P665 thru P675 <br />10' W of toe of slope <br />W <br />10/16/10 <br />8:51 <br />2x190 <br />C <br />JR <br />114 <br />10/16/10 <br />UL <br />JL <br />P <br />PT OK <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Primary Geomembrane Defect / Repair Summary - 100 mil LLDPE <br />Notes: <br />1. AT = Anchor Trench; TI = East, West, North, South Tie -In; WEOS = West End of Seam; EEOS = East End of Seam; NEOS = North End of Seam; SEOS = South End of Seam <br />2. * = 80 mil panel <br />3. Defect Type: <br />FM = Fishmouth <br />BO = Burnout <br />W = Wrinkle <br />DF = Destruct Fusion <br />DX = Destruct Extrusion <br />MD = Manufacturer Defect <br />• <br />PU = Puncture <br />PT = Pressure Test <br />@INT = Panel Intersection <br />Page 36 of 36 <br />DO = Damage by Others <br />WR = Welder Restart <br />4. Defect Repair Type: <br />P = Patch <br />C = Cap <br />B = Bead <br />• <br />ame <br />