My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (141)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (141)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:29 PM
Creation date
8/22/2011 11:35:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results 2010, VOL. IV, App. L.4- Pri. Geomb. Extrusion Welding Sum.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEAM <br />NO. <br />SEAM SECTION <br />DATE <br />START <br />TIME <br />AMBIENT <br />AIR TEMP. <br />of <br />WELD <br />TECH <br />MACH <br />#. <br />PRE- <br />HEAT <br />SETTING <br />MACHINE <br />TEMPERATURE <br />SEAM <br />LENGTH <br />WELDED <br />(FT) <br />QA <br />MONITOR <br />DESTRUCTIV <br />E SAMPLE <br />NO. <br />REMARKS <br />FROM <br />\ TO <br />SETTING <br />( <br />ACTUAL <br />( <br />P87 */P89 <br />NWEOS <br />\ SEEOS <br />09/29/10 <br />13:45 <br />74 <br />JR <br />564 <br />500 <br />550 <br />548 <br />3 <br />BE <br />P87 * /P90 <br />NWEOS <br />\ SEEOS <br />09/29/10 <br />13:47 <br />74 <br />JR <br />564 <br />500 <br />550 <br />553 <br />6 <br />BE <br />P88 * /P90 <br />NEOS <br />\ SEOS <br />09/29/10 <br />13:50 <br />74 <br />JR <br />564 <br />500 <br />550 <br />550 <br />19 <br />BE <br />P88 * /P91 <br />NEOS <br />\ SEOS <br />09/29/10 <br />14:02 <br />74 <br />JR <br />564 <br />500 <br />550 <br />546 <br />4 <br />BE <br />P89 */P91 <br />NEOS <br />\ SEOS <br />09/29/10 <br />14:05 <br />74 <br />JR <br />564 <br />500 <br />550 <br />541 <br />18 <br />BE <br />P89"/P92 <br />NEOS <br />\ SEOS <br />09/29/10 <br />14:15 <br />74 <br />JR <br />564 <br />500 <br />550 <br />556 <br />4 <br />BE <br />P90 */P92 <br />NEOS <br />\ SEOS <br />09/29/10 <br />14:19 <br />74 <br />JR <br />564 <br />500 <br />550 <br />553 <br />19 <br />BE <br />P90 */P93 <br />NEOS <br />\ SEOS <br />09/29/10 <br />14:28 <br />74 <br />JR <br />564 <br />500 <br />550 <br />541 <br />4 <br />BE <br />P91 */P93 <br />NEOS <br />\ SEOS <br />09/29/10 <br />14:31 <br />74 <br />JR <br />564 <br />500 <br />550 <br />552 <br />18 <br />BE <br />P91 */P155 <br />NEOS <br />\ SEOS <br />09/29/10 <br />14:42 <br />74 <br />JR <br />564 <br />500 <br />550 <br />547 <br />5 <br />BE <br />P92 */P155 <br />NEOS <br />\ SEOS <br />09/29/10 <br />14:45 <br />68 <br />JR <br />564 <br />500 <br />550 <br />549 <br />15 <br />BE <br />P92 * /P496 <br />WEOS <br />\ EEOS <br />09/29/10 <br />14:56 <br />68 <br />JR <br />564 <br />500 <br />550 <br />556 <br />9 <br />BE <br />P93 */P496 <br />WEOS <br />\ EEOS <br />09/29/10 <br />15:03 <br />68 <br />JR <br />564 <br />500 <br />550 <br />541 <br />13 <br />BE <br />P93 * /P497 <br />WEOS <br />\ EEOS <br />09/29/10 <br />15:10 <br />68 <br />JR <br />564 <br />500 <br />550 <br />548 <br />10 <br />BE <br />P94 */P497 <br />WEOS <br />\ EEOS <br />09/29/10 <br />15:23 <br />68 <br />JR <br />564 <br />500 <br />550 <br />547 <br />16 <br />EN <br />P94 * /P499 <br />WEOS <br />\ EEOS <br />09/29/10 <br />15:34 <br />68 <br />JR <br />564 <br />500 <br />550 <br />553 <br />6 <br />BE <br />P113 * /P49£ <br />WEOS <br />\ EEOS <br />09/29/10 <br />15:39 <br />68 <br />JR <br />564 <br />500 <br />550 <br />550 <br />22 <br />BE <br />DXP -8 <br />4' E of WEOS (DX), D -1147 <br />Notes: <br />• <br />TOTAL EXTRUSION WELDED SEAM FEET <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Primary Geomembrane Extrusion Welding Summary -100 mil LLDPE <br />• <br />amec <br />191.0 <br />1. AT = Anchor Trench; TI = East, West, North, South Tie -In; WEOS = West End of Seam; EEOS = East End of Seam; NEOS = North End of Seam; SEOS = South End of <br />2. *= 80 mil panel <br />Page 1 of 1 Technician: JR Machine Number: 564 <br />
The URL can be used to link to this page
Your browser does not support the video tag.