My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (141)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (141)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:29 PM
Creation date
8/22/2011 11:35:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results 2010, VOL. IV, App. L.4- Pri. Geomb. Extrusion Welding Sum.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />TOTAL EXTRUSION WELDED SEAM FEET <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Primary Geomembrane Extrusion Welding Summary - 100 mil LLDPE <br />• <br />ame$ <br />28.0 <br />Notes: <br />1. AT = Anchor Trench; TI = East, West, North, South Tie -In; WEOS = West End of Seam; EEOS = East End of Seam; NEOS = North End of Seam; SEOS = South End of <br />2. *= 80 mil panel <br />Page 1 of 1 Technician: JR Machine Number: 119 <br />SEAM SECTION <br />AMBIENT <br />PRE- <br />MACHINE <br />SEAM <br />SEAM <br />START <br />WELD <br />MACH <br />TEMPERATURE <br />LENGTH <br />QA <br />DESTRUCTIVE <br />NO. <br />FROM <br />\ TO <br />DATE <br />TIME <br />AIR TEMP. <br />( ° F) <br />TECH <br />#. <br />HEAT <br />SETTING <br />SETTING <br />o <br />(F) <br />ACTUAL <br />° <br />(F) <br />WELDED <br />(FT) <br />MONITOR <br />SAMPLE NO. <br />REMARKS <br />P63 * /P6f <br />WEOS <br />\ EEOS <br />09/11/10 <br />7:45 <br />40 <br />JR <br />119 <br />550 <br />550 <br />543 <br />3 <br />KL <br />P65/P65' <br />WEOS <br />\ EEOS <br />09/11/10 <br />7:55 <br />40 <br />JR <br />119 <br />550 <br />550 <br />549 <br />19 <br />KL <br />DXP1 -6 <br />16' E of WEDS (DX), D -795 <br />P65 */P67 <br />WEOS <br />\ EEOS <br />09/11/10 <br />8:07 <br />40 <br />JR <br />119 <br />550 <br />550 <br />543 <br />3 <br />KL <br />P66 */P67 <br />WEOS <br />\ 3' E <br />09/11/10 <br />8:08 <br />40 <br />JR <br />119 <br />550 <br />550 <br />542 <br />3 <br />KL <br />Seam finished by JR 117 <br />• <br />TOTAL EXTRUSION WELDED SEAM FEET <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Primary Geomembrane Extrusion Welding Summary - 100 mil LLDPE <br />• <br />ame$ <br />28.0 <br />Notes: <br />1. AT = Anchor Trench; TI = East, West, North, South Tie -In; WEOS = West End of Seam; EEOS = East End of Seam; NEOS = North End of Seam; SEOS = South End of <br />2. *= 80 mil panel <br />Page 1 of 1 Technician: JR Machine Number: 119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.