Laserfiche WebLink
.77 <br />During the dressing work feet to 3 feet of fine, loose sands were removed <br />from the foundation � <br />o lotion a�rea� for the co mp acted fill needed to dress the levee between <br />een <br />Stations 1 � <br />end 1 3+ o and laced with compacted fill. An -foot long pipe about <br />replaced <br />in in <br />diameter was also removed and the area filled with compacted fill. <br />The above summarizes our observations, testing and opinions regarding the <br />dressing of the levee. please call with any questions. <br />Very truly o u r, <br />CTUTH 11IIPS I I IN . <br />Frank J. Holliday, PE, CCE <br />Principal Engineer <br />F:dd <br />(3 copies s <br />I <br />M r. Les B <br />Leonard Rice Consulting Water Engineers, Inc. <br />401 1 1 " Street, Suite 300 <br />Denver, Colorado 80202 --11 <br />3 c: <br />M r. Michael J. Hart <br />Hart Environmental <br />P. 0. Box 130 <br />Boulder, CO 80306 <br />FLATIRON COMPANIE <br />C T UT a OS N O. 25,385 <br />