Mike Boulay <br />CAM: Figure 13 has been renamed Map -13. <br />-6- August 19, 2011 <br />the rail loop, that portion of the rail loop adjacent to the borrow area would, then, <br />be considered a haul road within the disturbed area and, as required under Rule <br />4.03.1(4) (a) (iii) and Rule 4.05.2, be required to pass the disturbed area runoff <br />through a sedimentation pond or other treatment facility. However, a recent <br />proposed change would eliminate the borrow area, borrow area topsoil stockpile <br />and pond 4 from the plan so that portion of the rail loop adjacent to the deleted <br />borrow area can again be considered a haul road not in the disturbed area, with <br />the appropriate non -pond sediment control measures employed. <br />In the July 8, 2011 submittal, Cam provided new hydrology designs and revised <br />maps. In addition, the Division understands that the borrow area will be deleted <br />from consideration. The Division has the following additional requests: <br />1) Please provide revised permit text, maps and hydrology designs that <br />take into account that the borrow area, borrow area topsoil stockpile and <br />pond 4 will be deleted from the Fruita Loadout plan, that there will be <br />three sediment ponds and that sediment control for the portion of the <br />railroad loop adjacent to the deleted borrow area will not involve a <br />sediment pond. <br />CAM: Permit maps, and various permit pages have been updated. <br />2) In the July 8, 2011 submittal, a new topsoil stockpile, topsoil pile #3, was <br />added along the railroad spur line. Since this topsoil stockpile does not <br />drain to a sediment pond, the stockpile needs to be designed as a small <br />area exemption (SAE). Please provide the appropriate hydrology designs <br />for the topsoil stockpile SAE, describe the topsoil stockpile SAE in the <br />appropriate permit text sections and add the SAE designation to the <br />appropriate maps. <br />CAM: A new SAE (SAE #1) has been designed for topsoil pile #2 and included <br />as part of Exhibit 9 and shown on Map -16. Exhibit 9 in its entirety has been <br />included due to pond #4 being removed and all pages being renumbered. <br />3) It appears that Figure 13 should be re- labeled as Map 13. <br />4) In the submittal dated April 12, 2011, the plan view drawings on Map 13 <br />for ponds 1 and 2 were small and difficult to read. However, in the July <br />11, 2011 submittal, the plan view drawings on Figure 13 (Map 13 ?) are <br />too small to read. Please submit new plan view drawings of each <br />sediment pond, at a scale that is large enough to easily read the contour <br />lines, contour intervals and elevations. <br />