My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-22_APPLICATION CORRESPONDENCE - C2010088 (2)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010088
>
2011-08-22_APPLICATION CORRESPONDENCE - C2010088 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:37:05 PM
Creation date
8/22/2011 8:56:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
APPLICATION CORRESPONDENCE
Doc Date
8/22/2011
Doc Name
Adequacy Response #3
From
J.E. Stover & Associates, Inc
To
DRMS
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Boulay <br />CAM - Please see revised page 2.05 -14 and Map -15. <br />51j—m. Items resolved. <br />Rule 2.05.3(4) Ponds, Impoundments, and Diversions <br />52 -55. Items resolved. <br />-13- August 19, 2011 <br />56. In the submittal dated April 11, 2011, CAM revised the curve number of the <br />wetlands to 74, which is a reasonable value to the Division. However, the April <br />11, 2011 submittal left out the Sedcad peak discharge data sheet for the west <br />culverts that had been included in the original submittal on page Exh -9 -7. In <br />addition, there are no Sedcad data sheets that show the peak discharge for the <br />designed event for the other culverts on site. Finally, there are no Sedcad <br />designs that show that a culvert of a certain diameter can handle the designed <br />peak discharge for the designed precipitation event. Please provide the <br />appropriate Sedcad data sheets for all of the loadout culverts. <br />CAM - Please see SedCad data sheets showing peak discharge for the requested <br />culverts begin on page EXH. 9 -69 in Appendix 9. The culverts were designed as <br />stated on page EXH 9 -2 which states the 'Culvert size based on Figure 4 -18 from <br />the Handbook of Steel Drainage and Highway Construction Products book'. <br />Division Response: In the submittal dated July 8, 2011, the Sedcad design <br />pages showing peak flows were provided as requested. As far as the design <br />pages showing the sizing of the culverts, CAM elected to depend on a reference <br />on page Exh 9 -2 to Figure 4 -18 of the Handbook of Steel Drainage and Highway <br />Construction Products. Since that reference book may not be readily <br />available to others, the Division requests that one generic copy of Figure 4- <br />18 be included with the culvert designs. <br />CAM - Please see revised Exhibit 9, page Exh. 9 -64 containing the requested <br />nomograph. <br />57 — 60a. Items resolved. <br />Rule 2.05.3(5) Topsoil Removal and Replacement <br />61 -63a. Items resolved. <br />Rule 2.05.3(6) Overburden <br />63b -c. Items resolved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.