My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-17_REVISION - M1977215
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-08-17_REVISION - M1977215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2020 2:21:03 PM
Creation date
8/22/2011 7:57:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
8/17/2011
Doc Name
Submittal of TR-17
From
Rio Grande Silver, Inc.
To
DRMS
Type & Sequence
TR17
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
water in this well is representative of the water RGS expects to encounter in the decline. Water <br />quality sample results are pending and will be forwarded to Colorado DRMS. <br />Pond Construction <br />Available growth medium material (12 to 18 inches) will be removed from pond areas and <br />stockpiled adjacent to areas where it is removed and will be located out of drainage areas to <br />prevent water erosion. <br />Berm fill shall consist of local borrow materials placed and compacted in accordance with a <br />method specification, as approved by the Project Manager and Design Engineer and where <br />shown on the Drawings. Compacted berm fill shall have a maximum particle size of 6 inches and <br />a lift thickness no greater than 12 inches. <br />Final topography and/or cross - sections will be surveyed of areas that are to finished grade and <br />compared to the design section for accuracy. The final surface shall be smooth and free of <br />protrusions, ruts, and open graded material. Liner subbase shall be prepared to the lines and <br />grades as indicated on the Drawings. The final surface is subject to approval by the liner installer <br />and the Design Engineer prior to placement of the geosynthetic liner <br />HDPE Liner Construction <br />The HDPE Liner will be installed by a certified installer. <br />Construction of the HDPE Liner or specified geosynthetics must be in compliance with the <br />design Drawings and Specifications. Rio Grande Silver shall implement a CQA monitoring and <br />testing program to ensure construction compliance by the Contractor. The QA program shall <br />consist of reviewing Contractor QC submittals, material conformance testing, and construction <br />monitoring and testing. <br />RECLAMATION <br />RGS will implement the same reclamation measures for the surface facilities of the proposed <br />underground exploration development work that are contained in the Stage 2 District -Wide <br />Exploration Program that was approved by the Forest Service in 2009 following the completion <br />of an Environmental Assessment. <br />The proposed Ponds #1 and #2 are on previously disturbed areas done by Homestake for its <br />Bulldog Mine operations and then reclaimed. RGS will contain its proposed facilities within the <br />boundaries of that previous disturbance. Past Homestake reclamation practices have shown that <br />the site can be successfully reclaimed. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.