Laserfiche WebLink
SEAM <br />NO. <br />SEAM SECTION <br />DATE <br />START <br />TIME <br />AMBIENT <br />AIR TEMP. <br />o <br />(F) <br />WELD <br />TECH <br />MACH <br />#. <br />SPEED <br />SETTING <br />MACHINE <br />TEMPERATURE <br />SEAM <br />LENGTH <br />WELDED <br />(ft) <br />QA <br />MONITOR <br />DESTRUCTIVE <br />SAMPLE NO. <br />REMARKS <br />FROM <br />\ TO <br />SETTING <br />CF) <br />ACTUAL <br />( <br />S1 /S2 <br />NEOS <br />\ SEOS <br />05/17/10 <br />10:54 <br />55 <br />JR <br />590 <br />4.0 <br />850 <br />834 <br />114 <br />MG <br />S4 /S5 <br />SEOS <br />\ NEOS <br />05/17/10 <br />11:46 <br />58 <br />JR <br />590 <br />4.0 <br />850 <br />835 <br />127 <br />MG <br />S9 /S10" <br />NWEOS <br />\ SEEOS <br />05/17/10 <br />14:00 <br />61 <br />JR <br />590 <br />4.0 <br />850 <br />832 <br />60 <br />MG <br />S12/S13 <br />NWEOS <br />\ SEEOS <br />05/17/10 <br />14:20 <br />61 <br />JR <br />590 <br />4.0 <br />850 <br />838 <br />59 <br />MG <br />DF -1 <br />47' E of WEOS (DF), D -10 <br />• <br />TOTAL FUSION WELDED SEAM FEET <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Secondary Geomembrane Fusion Welding Summary -100 mil LLDPE <br />• <br />ame <br />360.0 <br />Notes: <br />1. AT = Anchor Trench; TI = East, West, North, South Tie -In; WEOS = West End of Seam; EEOS = East End of Seam; NEOS = North End of Seam; SEOS = South End of Seam <br />" Seams not covered by trial seaming - Approved by certifying engineer <br />Page 1 of 1 <br />Technician: JR Machine Number: 590 <br />