My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (133)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (133)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:29 PM
Creation date
8/19/2011 12:59:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results 2010, VOL. IV, App. K.3- Sec. Geomb. Fusion Welding Sum.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEAM <br />NO. <br />SEAM SECTION <br />DATE <br />START <br />TIME <br />AMBIENT <br />AIR TEMP. <br />o <br />(F) <br />WELD <br />TECH <br />MACH <br />#. <br />SPEED <br />SETTING <br />MACHINE <br />TEMPERATURE <br />SEAM <br />LENGTH <br />WELDED <br />(ft) <br />QA <br />MONITOR <br />DESTRUCTIVE <br />SAMPLE NO. <br />REMARKS <br />FROM <br />\ TO <br />SETTING <br />CF) <br />ACTUAL <br />( <br />S1 /S2 <br />NEOS <br />\ SEOS <br />05/17/10 <br />10:54 <br />55 <br />JR <br />590 <br />4.0 <br />850 <br />834 <br />114 <br />MG <br />S4 /S5 <br />SEOS <br />\ NEOS <br />05/17/10 <br />11:46 <br />58 <br />JR <br />590 <br />4.0 <br />850 <br />835 <br />127 <br />MG <br />S9 /S10" <br />NWEOS <br />\ SEEOS <br />05/17/10 <br />14:00 <br />61 <br />JR <br />590 <br />4.0 <br />850 <br />832 <br />60 <br />MG <br />S12/S13 <br />NWEOS <br />\ SEEOS <br />05/17/10 <br />14:20 <br />61 <br />JR <br />590 <br />4.0 <br />850 <br />838 <br />59 <br />MG <br />DF -1 <br />47' E of WEOS (DF), D -10 <br />• <br />TOTAL FUSION WELDED SEAM FEET <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Secondary Geomembrane Fusion Welding Summary -100 mil LLDPE <br />• <br />ame <br />360.0 <br />Notes: <br />1. AT = Anchor Trench; TI = East, West, North, South Tie -In; WEOS = West End of Seam; EEOS = East End of Seam; NEOS = North End of Seam; SEOS = South End of Seam <br />" Seams not covered by trial seaming - Approved by certifying engineer <br />Page 1 of 1 <br />Technician: JR Machine Number: 590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.