Laserfiche WebLink
SEAM NO. <br />SEAM SECTION <br />DATE <br />START <br />TIME <br />AMBIENT <br />AIR TEMP. <br />(°F) <br />WELD <br />TECH <br />MACH <br />#. <br />SPEED <br />SETTING <br />MACHINE <br />TEMPERATURE <br />SEAM <br />LENGTH <br />WELDED <br />(ft) <br />QA <br />MONITOR <br />DESTRUCTIVE <br />SAMPLE NO. <br />REMARKS <br />FROM <br />\ TO <br />SETTING <br />( °F) <br />ACTUAL <br />( °F) <br />S790/S791 <br />EEOS <br />\ WEOS <br />09/01/10 <br />18:41 <br />65 <br />UL <br />208 <br />5.5 <br />750 <br />746 <br />10 <br />EN <br />S787/S790 <br />EEOS <br />\ WEOS <br />09/01/10 <br />18:49 <br />65 <br />UL <br />208 <br />5.5 <br />750 <br />739 <br />12 <br />EN <br />S780/S789 <br />EEOS <br />\ WEOS <br />09/01/10 <br />18:57 <br />62 <br />UL <br />208 <br />5.5 <br />750 <br />740 <br />20 <br />EN <br />S818/S819 <br />NWEOS <br />\ SEEOS <br />09/07/10 <br />9:35 <br />54 <br />UL <br />208 <br />5.5 <br />750 <br />745 <br />30 <br />JM <br />S819/S820 <br />EEOS <br />\ WEOS <br />09/07/10 <br />9:53 <br />54 <br />UL <br />208 <br />5.5 <br />750 <br />744 <br />111 <br />JM <br />S818/S820 <br />EEOS <br />\ WEOS <br />09/07/10 <br />10:31 <br />56 <br />UL <br />208 <br />5.5 <br />750 <br />746 <br />75 <br />JM <br />S824/S825 <br />EEOS <br />\ WEOS <br />09/07/10 <br />11:12 <br />58 <br />UL <br />208 <br />_ <br />5.5 <br />750 <br />748 <br />142 <br />JM <br />DF -198 <br />7' W of EEOS (DF), D -1947 <br />• <br />TOTAL FUSION WELDED SEAM FEET <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Secondary Geomembrane Fusion Welding Summary -100 mil LLDPE <br />Notes: <br />1. AT = Anchor Trench; TI = East, West, North, South Tie -In; WEOS = West End of Seam; EEOS = East End of Seam; NEOS = North End of Seam; SEOS = South End of Seam <br />** Seams not covered by trial seaming - Approved by certifying engineer <br />Page 2 of 2 <br />2,023.0 <br />• <br />amec <br />Technician: UL Machine Number: 208 <br />