Laserfiche WebLink
PART I <br />Page 13 of 26 <br />Permit No.: CO0036251 <br />an individual or position having overall responsibility for environmental matters for the <br />company. (A duly authorized representative may thus be either a named individual or any <br />individual occupying a named position); and, <br />3) The written authorization is submitted to the Division. <br />b. If an authorization as described in this section is no longer accurate because a different individual <br />or position has responsibility for the overall operation of the facility, a new authorization <br />satisfying the requirements of this section must be submitted to the Division prior to or together <br />with any reports, information, or applications to be signed by an authorized representative. <br />The permittee, or the duly authorized representative shall make and sign the following <br />certification on all such documents: <br />"I certify under penalty of law that this document and all attachments were prepared under my <br />direction or supervision in accordance with a system designed to assure that qualified personnel <br />properly gather and evaluate the information submitted. Based on my inquiry of the person or <br />persons who manage the system, or those persons directly responsible for gathering the <br />information, the information submitted is to the best of my knowledge and belief, true, accurate <br />and complete. I am aware that there are significant penalties for submitting false information, <br />including the possibility of fine and imprisonment for knowing violations." <br />