My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-10_REVISION - P2011019
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2011019
>
2011-08-10_REVISION - P2011019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:37:37 AM
Creation date
8/18/2011 1:46:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011019
IBM Index Class Name
Revision
Doc Date
8/10/2011
Doc Name
FW request (MD-01)
From
DRMS
To
Oregon Energy, LLC
Type & Sequence
MD1
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loader Worksheet Cont'd Task # O1C Page 2 of 2 <br />Load Bucket Capacity <br />Rated Capacity: 1.50 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - uniform aggregates to 1/8" (95- 100 %) 0.975 <br />Adjusted Capacity: 1.46 LCY <br />Job Condition Correction Factors <br />Site Altitude: 6200 feet <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />0.97 <br />0.83 <br />0.81 <br />Source <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />Total Travel Time: 0.0176 minutes <br />Total Cycle Time: 0.4826 minutes <br />Unadjusted Hourly Unit Production: 181.81 LCY /Hour <br />Adjusted Hourly Unit Production: 146.38 LCY /Hour <br />Adjusted Hourly Fleet Production: 146.38 LCY /Hour <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 16.33 • Hours <br />Unit cost: $0.562 /LCY Total job cost: $1,343.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.