Laserfiche WebLink
Loader Worksheet Cont'd Task # O1C Page 2 of 2 <br />Load Bucket Capacity <br />Rated Capacity: 1.50 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - uniform aggregates to 1/8" (95- 100 %) 0.975 <br />Adjusted Capacity: 1.46 LCY <br />Job Condition Correction Factors <br />Site Altitude: 6200 feet <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />0.97 <br />0.83 <br />0.81 <br />Source <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />Total Travel Time: 0.0176 minutes <br />Total Cycle Time: 0.4826 minutes <br />Unadjusted Hourly Unit Production: 181.81 LCY /Hour <br />Adjusted Hourly Unit Production: 146.38 LCY /Hour <br />Adjusted Hourly Fleet Production: 146.38 LCY /Hour <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 16.33 • Hours <br />Unit cost: $0.562 /LCY Total job cost: $1,343.00 <br />CIRCES Cost Estimating Software <br />