Laserfiche WebLink
Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Material up to 1/8" diameter 0.02 <br />0.020 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high or Less 0.01 <br />0.010 <br />(Cat HB) <br />Truck Ownership: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Task description: <br />Site: Maybell <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Attachment 1: <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Loader Cycle Time: <br />Haul and Return Time <br />WHEEL LOADER — LOAD AND CARRY WORK <br />MD1 Backfill mud pits <br />PROJECT IDENTIFICATION <br />Task #: O1C State: Colorado <br />Date: 8/5/2011 County: Moffat <br />User: DMC <br />Agency or organization name: DRMS <br />CAT 446B (2004) <br />ROPS Cab <br />$18.49 <br />$25.24 <br />$38.49 <br />$82.22 <br />Total Fleet Cost/Hour: $82.22 <br />MATERIAL QUANTITIES <br />Initial volume: 1,889 CCY <br />Loose volume: 2,391 LCY <br />Source of estimated volume: 34 pits, 25'L x 15'W x 4'D <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Haul Route: <br />Return Route: <br />Length <br />(feet) <br />Page 1 of 2 <br />Permit Action: Initial Bond Permit/Job #: P2011019 <br />Utilization % <br />NA <br />100 <br />NA <br />Unadjusted Basic Cycle Time (load, dump, maneuver): 0.475 minutes <br />Rolling Resistance — Road Conditions <br />Haul: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Return: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Grade Res. <br />( %) <br />Rolling <br />Res. ( %) <br />Horsepower: 101 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Swell factor: 1.266 <br />Total Res. <br />( %) <br />Abbreviation: None <br />Filename: P019 -01c <br />m <br />Net Cycle Time Adjustment: 0 010 tnutes <br />Adjusted Basic Cycle Time: 0.465 minutes <br />12.5 <br />12.5 <br />0.00 <br />0.00 <br />5.00 <br />5.00 <br />5.00 <br />5.00 <br />0.0088 <br />0.0088 <br />Travel Time <br />(minutes) <br />Source <br />(Cat HB) <br />(Cat HB) <br />CIRCES Cost Estimating Software <br />