My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-11_PERMIT FILE - P2010026
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2010026
>
2011-08-11_PERMIT FILE - P2010026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:48 PM
Creation date
8/18/2011 1:45:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010026
IBM Index Class Name
PERMIT FILE
Doc Date
8/11/2011
Doc Name
3rd notice of deficiency
From
DRMS
To
Shell Exploration & Production Company
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />( %) <br />( %) <br />(min) <br />1 <br />700.00 <br />2.00 <br />8.00 <br />10.00 <br />659 <br />1.09 <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />( %) <br />( %) <br />(min) <br />1 <br />700.00 <br />-2.00 <br />8.00 <br />6.00 <br />1982 <br />0.52 <br />Scraper Worksheet Cont'd Task # 07A <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Travel Time: <br />Road Condition: Soft, rutted dirt, no maintenance or water, 4" tire penetration 8.0 <br />Haul Route: <br />Net Correction: <br />0.830 <br />0.830 <br />0.90 Minutes <br />0.00 Minutes <br />Return Route: <br />Haul Time: <br />Return Time: <br />Total Scraper team cycle time: 2.51 minutes <br />Adjusted for job conditions: 389.73 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 779.45 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 779.45 LCY/Hour <br />Unadjusted unit production/hour: 469.55 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 33.33 Hours <br />Unit cost: $0.712 /LCY Total job cost: $18,494.17 <br />1.09 minutes <br />0.52 minutes <br />Page 2 of 2 <br />Site Altitude: 6615 feet <br />CIRCES Cost Estimating Software <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Scraper Worksheet Cont'd Task # 07A <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Travel Time: <br />Road Condition: Soft, rutted dirt, no maintenance or water, 4" tire penetration 8.0 <br />Haul Route: <br />Net Correction: <br />0.830 <br />0.830 <br />0.90 Minutes <br />0.00 Minutes <br />Return Route: <br />Haul Time: <br />Return Time: <br />Total Scraper team cycle time: 2.51 minutes <br />Adjusted for job conditions: 389.73 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 779.45 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 779.45 LCY/Hour <br />Unadjusted unit production/hour: 469.55 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 33.33 Hours <br />Unit cost: $0.712 /LCY Total job cost: $18,494.17 <br />1.09 minutes <br />0.52 minutes <br />Page 2 of 2 <br />Site Altitude: 6615 feet <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.