My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-11_PERMIT FILE - P2010026
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2010026
>
2011-08-11_PERMIT FILE - P2010026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:48 PM
Creation date
8/18/2011 1:45:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010026
IBM Index Class Name
PERMIT FILE
Doc Date
8/11/2011
Doc Name
3rd notice of deficiency
From
DRMS
To
Shell Exploration & Production Company
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Replace stockpiled topsoil over 12.2 acres <br />Permit Action: Reclamation Cost <br />Site: Multi- Mineral RDD Lease Estimate <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Cost Breakdown: <br />07A <br />8/10/2011 <br />THM <br />Agency or organization name: <br />HOURLY EQUIPMENT <br />Total work team cost/hour: $554.83 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />2,800 lbs/LCY <br />Granite - Broken <br />55,000 pounds <br />19.64 LCY <br />SCRAPER TEAM WORK <br />State: Colorado <br />County: Rio Blanco <br />DRMS <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Scraper Work Team <br />Equipment Description <br />Cat 623G <br />Cat D8R Series II - 8SU (2005) <br />NA <br />NA <br />NA <br />NA <br />MATERIAL QUANTITIES <br />Initial volume: 19,683 CCY <br />Cat Handbook <br />COSTShift basis: 1 per day <br />Support Eauinment <br />Swell factor: 1.320 <br />Loose volume: 25,982 LCY <br />Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />Permit/Job #: P2010026 <br />Abbreviation: None <br />18.00 <br />23.00 <br />20.50 <br />19.64 <br />Page 1 of 2 <br />Filename: P026 -07a <br />Maintenance Eauinment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$64.15 <br />$39.08 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$108.98 <br />$81.13 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />$38.49 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$198.07 <br />$158.69 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$554.83 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Task description: Replace stockpiled topsoil over 12.2 acres <br />Permit Action: Reclamation Cost <br />Site: Multi- Mineral RDD Lease Estimate <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Cost Breakdown: <br />07A <br />8/10/2011 <br />THM <br />Agency or organization name: <br />HOURLY EQUIPMENT <br />Total work team cost/hour: $554.83 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />2,800 lbs/LCY <br />Granite - Broken <br />55,000 pounds <br />19.64 LCY <br />SCRAPER TEAM WORK <br />State: Colorado <br />County: Rio Blanco <br />DRMS <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Scraper Work Team <br />Equipment Description <br />Cat 623G <br />Cat D8R Series II - 8SU (2005) <br />NA <br />NA <br />NA <br />NA <br />MATERIAL QUANTITIES <br />Initial volume: 19,683 CCY <br />Cat Handbook <br />COSTShift basis: 1 per day <br />Support Eauinment <br />Swell factor: 1.320 <br />Loose volume: 25,982 LCY <br />Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />Permit/Job #: P2010026 <br />Abbreviation: None <br />18.00 <br />23.00 <br />20.50 <br />19.64 <br />Page 1 of 2 <br />Filename: P026 -07a <br />Maintenance Eauinment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.