Laserfiche WebLink
• <br />• <br />SEDCAD 4 for Windows <br />f:nnvrinhf 1QOR -inin P -i. 1 Crhwah <br />23 <br />Structure #19 (Pond <br />Sump pond on E Tay Creek at Sta 40 <br />Pond Inputs: <br />Pond Results: <br />Initial Pool Elev: <br />90.01 ft <br />Initial Pool: <br />0.00 ac -ft <br />*Sediment Storage: <br />0.00 ac -ft <br />Dead Space: <br />0.00% <br />*No sediment capacity defined <br />Emergency Spillway <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />100.00 20.00 2.00:1 2.00:1 20.00 <br />Peak Elevation: <br />100.56 ft <br />H'graph Detention Time: <br />2.43 hrs <br />Pond Model: <br />CSTRS <br />Dewater Ti me: <br />0.64 days <br />Trap Efficiency: <br />95.92 % <br />Dewatenng time is calculated from peak stage to lowest spillway <br />Elevation - Capacity- Discharge Table <br />Elevation <br />Area <br />(ac) <br />Capacity <br />(ac -ft) <br />Discharge Dewater <br />Time <br />(cfs) (hrs) <br />90.00 <br />0.050 <br />0.000 <br />0.000 Top of Sed. Storage <br />90.01 <br />0.050 <br />0.001 <br />0.000 <br />90.10 <br />0.050 <br />0.005 <br />0.000 <br />90.50 <br />0.059 <br />0.027 <br />0.000 <br />91.00 <br />0.070 <br />0.059 <br />0.000 <br />91.50 <br />0.083 <br />0.097 <br />0.000 <br />92.00 <br />0.096 <br />0.142 <br />0.000 <br />92.50 <br />0.111 <br />0.193 <br />0.000 <br />93.00 <br />0.127 <br />0.253 <br />0.000 <br />93.50 <br />0.143 <br />0.320 <br />0.000 <br />94.00 <br />0.161 <br />0.397 <br />0.000 <br />94.50 <br />0.180 <br />0.482 <br />0.000 <br />95.00 <br />0.200 <br />0.577 <br />0.000 <br />Filename: E Taylor Sed Pond Post Mining Phase 10 24.so4 Printed 12 -12 -2010 <br />Exh. 7 -ET -61 Revision Date: 12/31 /10 <br />Revision No.: TR -81 <br />