My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-17_REVISION - C1980001
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980001
>
2011-08-17_REVISION - C1980001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:37:00 PM
Creation date
8/18/2011 7:38:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
REVISION
Doc Date
8/17/2011
Doc Name
Preliminary Adequacy Letter, First Round Comment Response
From
WWC Enegineering
To
DRMS
Type & Sequence
RN6
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'6"A' ENGINEERING <br />August 12, 2011 <br />Permit C- 1980 -001 <br />Janet Binns <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street <br />Room 215 <br />Denver, Colorado 80203 -2273 <br />Dear Janet: <br />CDRMS Comments <br />611 Skyline Road - Laramie, Wy 82070 - (307) 742 -0031 <br />FAX (307) 721 -2913 - E -mail: infolar @wwcengineering.com <br />:RECEIVE) <br />AUG 1.7 2011 <br />Division of keclamation, <br />Mining and Safety <br />RE: Edna Mine, Permit C- 1980 -001, Permit Renewal No. 6, Preliminary Adequacy Letter, <br />First Round Comment Response <br />This letter presents First Round Comment Response to the Colorado Division of Reclamation, <br />Mining and Safety's (CDRMS) Preliminary Adequacy Letter for Permit Renewal No. 6 <br />Application for the Chevron Mining Inc. (CMI) Edna Mine, Permit No. C -1980 -001 (Permit) and <br />verbal communication with Janet Binns of CDRMS on August 12, 2011. The First Round <br />Comments were presented in CDRMS Letter from Janet Binns on July 18, 2011 and received by <br />WWC Engineering (WWC) on August 4, 2011. This response pertains to Permit Renewal <br />Application No. 6 submitted on May 10, 2011 to CDRMS by WWC on behalf of CMI. CDRMS <br />Comments are reproduced below for clarity. CMI responses are in italicized text below the <br />pertinent comment. <br />1. The Division has identified discrepancies in the Permit Renewal application Acreage <br />values. The applicant's total disturbed area, affected area, permit acreage, and private <br />surface acreage do not agree with the Division's database. The Division's database was <br />last corrected on September 20, 2000. Please bring Chevron's acreage values into <br />agreement with the Division's database. <br />CMI Response <br />Per verbal discussion with Janet Binns on August 12, 2011 CMI corroborates acreages <br />submitted within the Permit Renewal No. 6 Application. CDRMS began using a revised <br />Division's Database <br />acres <br />Chevron Mining Inc. RN6 Appl. <br />acres <br />Disturbed Area <br />1186.40 <br />1193.40 <br />Affected Area <br />1186.40 <br />1305.30 <br />Permit Acreage <br />3257.30 <br />3428.50 <br />Private Acreage <br />2913.30 <br />3084.50 <br />'6"A' ENGINEERING <br />August 12, 2011 <br />Permit C- 1980 -001 <br />Janet Binns <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street <br />Room 215 <br />Denver, Colorado 80203 -2273 <br />Dear Janet: <br />CDRMS Comments <br />611 Skyline Road - Laramie, Wy 82070 - (307) 742 -0031 <br />FAX (307) 721 -2913 - E -mail: infolar @wwcengineering.com <br />:RECEIVE) <br />AUG 1.7 2011 <br />Division of keclamation, <br />Mining and Safety <br />RE: Edna Mine, Permit C- 1980 -001, Permit Renewal No. 6, Preliminary Adequacy Letter, <br />First Round Comment Response <br />This letter presents First Round Comment Response to the Colorado Division of Reclamation, <br />Mining and Safety's (CDRMS) Preliminary Adequacy Letter for Permit Renewal No. 6 <br />Application for the Chevron Mining Inc. (CMI) Edna Mine, Permit No. C -1980 -001 (Permit) and <br />verbal communication with Janet Binns of CDRMS on August 12, 2011. The First Round <br />Comments were presented in CDRMS Letter from Janet Binns on July 18, 2011 and received by <br />WWC Engineering (WWC) on August 4, 2011. This response pertains to Permit Renewal <br />Application No. 6 submitted on May 10, 2011 to CDRMS by WWC on behalf of CMI. CDRMS <br />Comments are reproduced below for clarity. CMI responses are in italicized text below the <br />pertinent comment. <br />1. The Division has identified discrepancies in the Permit Renewal application Acreage <br />values. The applicant's total disturbed area, affected area, permit acreage, and private <br />surface acreage do not agree with the Division's database. The Division's database was <br />last corrected on September 20, 2000. Please bring Chevron's acreage values into <br />agreement with the Division's database. <br />CMI Response <br />Per verbal discussion with Janet Binns on August 12, 2011 CMI corroborates acreages <br />submitted within the Permit Renewal No. 6 Application. CDRMS began using a revised <br />
The URL can be used to link to this page
Your browser does not support the video tag.