Summary of Planning Items: <br />Continue slope contouring and subgrade preparation within the Phase 5 VLF. <br />Continue subgrade acceptance prior to SLF placement. <br />Continue SLF placement. <br />Continue subgrade acceptance prior to geomembrane deployment. <br />Continue geomembrane installation. <br />Continue obtaining samples and assisting in the process of DCF material at the DCF Process area. <br />Continue excavation and backfill of the existing (temporary) Phase 5 anchor trench. <br />Continue geomembrane exposure. <br />Continue installation of the high volume solution collection system. <br />Continue DCF placement. <br />Continue leak detection system installation. <br />Continue 80mil primary geomembrane acceptance within the Phase 5 VLF. <br />Continue interim certification report development. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V: <br />CC &V held a weekly construction meeting on July 26, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. Geomembrane pre- construction topics were also <br />discussed during the meeting. <br />Ames Construction: <br />None <br />AMEC: <br />Jay Moore was on -site on 7/29/2011 to observe /discuss project activities, progress, and scheduling. <br />Summary of Incidents /Accidents/Health & Safety Issues: <br />None <br />We trust the information provided clearly represents our findings and observations for the week ending <br />July 30, 2011. <br />Joseph Hickey, CQA Monito <br />Approved By: <br />Date: July 30, 2011 <br />Date: 1 p R -Vert/ <br />VLF Weekly Report WE 07.30.2011 <br />