Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 003 State : Colorado <br />Date : 08/10/2011 County :Mineral <br />User : RCO Site : South Upper Rat Creek <br />Agency or organization name :DRMS <br />Permit or other job action : New NO! <br />Task description :Pull up material for recontouring pads (3) <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : <br />889 <br />HOURLY PRODUCTION <br />Ownership cost/hour : <br />Operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />BCY <br />Source of estimated swell factor :NA <br />Job Condition Correction Factors <br />Site altitude : 11,500 feet <br />Machine description :Cat 320C <br />$26.97 <br />$32.00 <br />$38.72 <br />$97.69 <br />Source of estimated volume :24000 sf x 1 ft avg depth <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.28 minutes <br />Bucket Capacity <br />Rated bucket capacity : 1.63 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90 %) <br />Adjusted bucket capacity : 1.39 LCY <br />Unadjusted hourly unit production : <br />Adjusted hourly unit production : <br />Adjusted hourly fleet production : <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) <br />Unit cost : <br />CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />$0.484 per LCY <br />Utilization % <br />NA <br />100 <br />NA <br />Altitude adjustment : <br />Job efficiency adjustment : <br />Net job correction : <br />292.71 LCY /hour <br />201.65 LCY /hour <br />LCY /hour <br />201.65 <br />Permit/job # :P- 2011 -023 <br />Abbreviation :none <br />Filename : P023 -003 <br />Total job time : <br />Total job cost : <br />Horsepower: 138 <br />Weight (MT) : 19.70 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : <br />Swell Loose <br />factor : 1.330 volume : 1,182 LCY <br />0.83 <br />0.83 <br />0.69 <br />5.86 <br />$573 <br />hours <br />$97.69 <br />Source <br />(Cat HB) <br />(1 shift/day) <br />multiplier <br />