My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-10_PERMIT FILE - P2011023
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011023
>
2011-08-10_PERMIT FILE - P2011023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:46 PM
Creation date
8/16/2011 2:02:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011023
IBM Index Class Name
PERMIT FILE
Doc Date
8/10/2011
Doc Name
Approval to commence prospecting
From
DRMS
To
Rio Grande Silver, Inc.
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />002 <br />Task #: <br />Date : 08/10/2011 <br />User : RCO <br />Agency or organization name :DRMS <br />Permit or other job action : New NOI <br />Task description :Backfill pad sumps (3 per pad, on 3 pads) <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : <br />200 <br />Material consistency description : <br />Consolidated stockpile <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />CCY <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County :Mineral <br />Site : South Upper Rat Creek <br />Basic machine <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Source of estimated volume :10x10x6 ft sump x 9 sumps total <br />Source of estimated swell factor :na <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 464.3 LCY /hr <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 11,500 feet <br />Material weight : 2,900 lbs/LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />1 Dozer(s) <br />$0.458 /LCY <br />Swell <br />factor : <br />:Cat D5G LGP - 5P <br />:Power Angle Tilt <br />: ROPS Cab <br />:3-shank ripper <br />$17.95 <br />$24.13 <br />$0.00 <br />$38.54 <br />$80.62 <br />1.165 <br />Permit/job# : P- 2011 -023 <br />Abbreviation :none <br />Filename :P023 -002 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Loose <br />volume : <br />Horsepower : 90 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : <br />233 LCY <br />$80.62 <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />Net correction : <br />Adjusted unit production : <br />Adjusted fleet production : <br />Total job time : <br />Total job cost : <br />0.75 <br />1.00 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.00 <br />0.96 <br />0.79 <br />1.00 <br />0.38 <br />175.98 LCY /hr <br />175.98 LCY /hr <br />1.32 Hours <br />$107 <br />Source <br />(avg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1 shift/day) <br />(fnd-rt) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />(PAT) <br />
The URL can be used to link to this page
Your browser does not support the video tag.