My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-10_PERMIT FILE - P2011023
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011023
>
2011-08-10_PERMIT FILE - P2011023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:46 PM
Creation date
8/16/2011 2:02:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011023
IBM Index Class Name
PERMIT FILE
Doc Date
8/10/2011
Doc Name
Approval to commence prospecting
From
DRMS
To
Rio Grande Silver, Inc.
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS <br />Depreciation <br />Ownership Costs <br />CFC <br />Overhead <br />Overhaul <br />Labor <br />Parts <br />Overhaul <br />Field <br />Labor <br />and Operating <br />Repair <br />Parts <br />Costs <br />Fuel <br />Lube <br />Tires <br />sheet 2 of 2 <br />G.E.C. <br />Acquisition cost : <br />$5.73 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Econ.life -Dozer and ROPS : <br />$5.73 <br />NA <br />NA <br />$4.49 <br />$4.24 <br />$5.48 <br />$3.37 <br />NA <br />NA <br />NA <br />NA <br />- Attachment no. 2 : <br />NA <br />NA <br />NA <br />$0.53 <br />$0.34- <br />$0.88 <br />$0.42 <br />NA <br />NA <br />NA <br />NA <br />Annual usage : <br />$9.42 <br />$4.50 <br />$4.03 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Double shifts : <br />$7.07 <br />$2.25 <br />$2.01 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Triple shifts : <br />$6.28 <br />$1.50 <br />$1.34 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Mechanic labor -Dozer and ROPS : <br />NA <br />NA <br />NA <br />$2.62 <br />NA <br />$3.20 <br />NA <br />NA <br />NA <br />NA <br />NA <br />- Attachment no. 2 : <br />NA <br />NA <br />NA <br />$0.31 <br />NA <br />$0.51 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Fuel /lube -Dozer and ROPS : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$8.32 <br />$1.71 <br />$0.00 <br />$0.67 <br />Attachment no. 2 : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.09 <br />$0.00 <br />$0.35 <br />ADJUSTED COST SUBTOTALS <br />Ownership Costs <br />Depreciation CFC Overhead <br />Overhaul <br />Labor I Parts <br />Overhaul and Operating Costs <br />Field Repair <br />Labor I Parts Fuel I <br />Lube <br />I Tires <br />I G.E.C. <br />Dozer, ROPS and Attachment no. 2 : <br />Fuel <br />type <br />Dozer and ROPS : <br />Dozer : <br />Blade : <br />Attachment no. 1 : <br />Attachment no. 2 : <br />Cat D5G LOP - 5P <br />90 <br />NA <br />10.1 <br />13.0 <br />7.8 <br />9.0 <br />Single shifts : <br />$9.42 <br />$4.50 <br />$4.03 <br />$2.62 $4.24 <br />$3.20 <br />NA <br />$3.37 <br />$8.32 <br />NA <br />$1.71 <br />$0.00 <br />$0.67 <br />Double shifts : <br />$7.07 <br />$2.25 <br />$2.01 <br />Attachment no. 2 : <br />NA <br />NA <br />3 -shank ripper <br />NA <br />NA <br />0.6 <br />2.6 <br />5.1 <br />Triple shifts : <br />$6.28 <br />$1.50 <br />$1.34 <br />$0.31 $0.34 <br />$0.51 <br />$0.42 <br />$0.00 <br />$0.09 <br />$0.00 <br />$0.35 <br />EQUIPMENT PERFORMANCE DATA <br />Description <br />Horsepower <br />(FHP) <br />Transmission <br />Type <br />Weight <br />(UST) <br />Length <br />(ft) <br />Width <br />(ft) <br />Height <br />(ft) <br />Fuel <br />type <br />Ripper <br />type <br />Dozer : <br />Blade : <br />Attachment no. 1 : <br />Attachment no. 2 : <br />Cat D5G LOP - 5P <br />90 <br />NA <br />10.1 <br />13.0 <br />7.8 <br />9.0 <br />diesel <br />NA <br />Power Angle Tilt <br />NA <br />NA <br />1.4 <br />NA <br />10.7 <br />3.3 <br />NA <br />NA <br />ROPS Cab <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />3 -shank ripper <br />NA <br />NA <br />0.6 <br />2.6 <br />5.1 <br />1.1 <br />NA <br />Fixed Paralelogram <br />HOURLY OPERATOR WAGES <br />Base <br />Rate <br />Fringe <br />Benefits <br />F.I.C.A. <br />Unempl. <br />Wk.Comp. <br />Total <br />($ /hr) <br />Shift Differential <br />Colorado labor zone : <br />2 <br />7.65% <br />6.20% <br />10.00% <br />Dozer operator (< 70hp) <br />$23.67 <br />$9.22 <br />$1.81 <br />$1.47 <br />$2.37 <br />$38.54 <br />Day : <br />$0.00 <br />Two shift per day average : <br />$0.15 <br />Dozer operator ( > =70hp) <br />$23.67 <br />$9.22 <br />$1.81 <br />$1.47 <br />$2.37 <br />$38.54 <br />Swing : <br />$0.30 <br />Three shift per day average : <br />$0.25 <br />Mechanic <br />$16.74 <br />$4.20 <br />$1.28 <br />$1.04 <br />$1.67 <br />$24.93 <br />Night : <br />$0.45 <br />HOURLY EQUIPMENT COST SUMMARY <br />Ownership <br />Operating <br />Machine <br />and Overhaul <br />Attachments <br />Operator <br />Total <br />Cost/hr ($) <br />Single shifts : <br />$17.95 <br />$24.13 <br />$2.02 <br />$38.54 <br />$82.64 <br />Double shifts : <br />$11.33 <br />$24.13 <br />$2.02 <br />$38.69 <br />$76.17 <br />Triple shifts : <br />$9.12 <br />$24.13 <br />$2.02 <br />$38.79 <br />$74.06 <br />Total weight : 12.2 (UST) <br />
The URL can be used to link to this page
Your browser does not support the video tag.