Laserfiche WebLink
Comment 3: Please commit to providing the Division with a final construction report detailing <br />the installation of the slurry wall, describing any problems that occurred, and listing the results of <br />testing that was conducted under the approved quality assurance /quality control plan. <br />Response 3: Weld County will provide the Division with the final construction report including the <br />final As -Built drawings for the slurry wall. Furthermore, proof that the slurry wall passed the <br />Division of Water Resources required 90 -day leak test will be provided. <br />Thank you for your assistance with this matter. <br />Sincerely, <br />Enclosures <br />kr <br />Clay Kimmi, P.E., CFM <br />Weld County Public Works <br />M: \DAVE B \Geisert Pit\DRMS Permit Amendment\Response to TR3 Comments 8- 10- 11.doc <br />