TABLE B <br />Reclamation Work Completed for Permit M- 1977 -300 <br />Reclamation Work Description <br />Bonded Cost (in dollars) <br />Non - Demolition Reclamation Work Completed <br />438.00 <br />• Demolish Domestic Well Cistern & Concrete Pad to M- 2001 -036. <br />• West Waste Pile Re- contour Work (completed 11/2001) <br />• 6.0 acres of bulldozer ripping cost superceded by M- 2001 -036. <br />- Regrade West Waste Pile (Push 35,000 tons 150 ft. downhill) <br />34,060.00 <br />- Grade Flat Areas (West Pile) (Push 35,000 tons 400 ft. on flat) <br />29,236.00 <br />Note: See 09/09/94 memo from T. Pierce to W. York -Feirn for work description. <br />• 4,840 yd of topsoil spreading cost now under M- 2001 -036. <br />2,178.00 <br />• Seal Charley Adit (completed 10/2000) <br />2,346.50 <br />• Seal Upper Adit (completed 07/2000) <br />2,346.50 <br />• Construct East Dump Energy Dissapator (completed 09/2000) <br />37,975.00 <br />Subtotal for Non - Demolition Reclamation Work 105,963.00 <br />TABLE C <br />Permit M- 1977 -300 Reclamation Work Now Covered by Permit M- 2001 -036 <br />Reclamation Work Description <br />Bonded Cost (in dollars) <br />• Demolish Domestic Well House & Concrete Pad to M- 2001 -036. <br />438.00 <br />• Demolish Domestic Well Cistern & Concrete Pad to M- 2001 -036. <br />3,162.00 <br />• 6.0 acres of bulldozer ripping cost superceded by M- 2001 -036. <br />1,519.00 <br />• 6.0 acres of shallow -slope seeding cost now under M- 2001 -036. <br />3,160.00 <br />• 4,840 yd of topsoil purchase cost now under M- 2001 -036. <br />24,200.00 <br />• 4,840 yd of topsoil spreading cost now under M- 2001 -036. <br />2,178.00 <br />Subtotal of Reclamation Work Covered by M- 2001 -036 <br />34,657.00 <br />Financial Warranty Reduction <br />Permit M- 1977 -300 <br />1 February, 2002 <br />Page 3 of 4 <br />Overlap of Permit Affected Lands Between Permit M- 1977 -300 and Permit M- 2001 -036: <br />Limited Impact 110a Permit M- 2001 -036 was issued to Cotter by the Division in 2001 for a <br />construction materials mining operation in the same general area as the existing 112r Metal <br />/ Hard Rock mining Permit M- 1977 -300. The 8.6 acres of affected area for Permit M- 2001 -036 <br />overlaps an equivalent amount of affected area for Permit M- 1977 -300. Cotter requests the <br />transfer of reclamation responsibility for the overlapping affected area from Permit M- 1977 -300 <br />to Permit M- 2001 -036. The overlapping area is no longer required for the metal mining <br />operation and will be used as part of the construction materials mining operation. Table C <br />details the reclamation work that will be removed from the reclamation plan and financial <br />warranty for Permit M- 1977 -300 and transferred to Permit M- 2001 -036. <br />Total Reduction in Permit M- 1977 -300 Direct Reclamation Costs: <br />The total calculated reduction in direct reclamation costs for Permit M- 1977 -300 using the <br />subtotals from Table A, Table B, and Table C are: <br />$455,115.00 <br />