Laserfiche WebLink
TABLE B <br />Reclamation Work Completed for Permit M- 1977 -300 <br />Reclamation Work Description <br />Bonded Cost (in dollars) <br />Structure Demolition and Disposal N <br />• Electrical Storage Building <br />819.00 <br />• Warehouse #2 <br />13,249.00 <br />- Warehouse #2 Footers <br />2,051.00 <br />• Bit Shop / Storage Building <br />1,527.00 <br />- Bit Shop / Storage Concrete Pad <br />2,151.00 <br />• Electric Shop Building <br />2,659.00 <br />- Electric Shop Concrete Pad <br />12,393.00 <br />• Warehouse #1 Building <br />4,205.00 <br />• Environmental Building <br />2,039.00 <br />- Environmental Building Concrete Pad <br />3,008.00 <br />• Worthington Building <br />369.00 <br />• Lube Storage Shed <br />934.00 <br />- Lube Storage Shed Concrete Pad <br />2,813.00 <br />• Core Library Building <br />2,924.00 <br />• IR Shed <br />2,181.00 <br />- IR Shed Concrete Pad <br />4,960.00 <br />• Guard Post Lift Station <br />273.00 <br />• Guard Post <br />304.00 <br />• Firehouse #1 <br />90.00 <br />• Firehouse #2 <br />90.00 <br />• Powder Magazine <br />9,575.00 <br />- Powder Magazine Concrete Pad <br />3,672.00 <br />• Cap Magazine <br />4,416.00 <br />- Cap Magazine Concrete Pad <br />1,082.00 <br />• Domestic Well Pressure Tank <br />2,689.00 <br />- Domestic Well Pressure Tank Concrete Pad <br />563.00 <br />• Records Vault <br />2,502.00 <br />- Records Vault Concrete Pad <br />500.00 <br />• Pre -cast Main Office / Change Room Building <br />20,291.00 <br />- Pre -cast Main Office / Change Room Concrete Pad <br />22,167.00 <br />- Pre -cast Main Office / Change Room Retaining Wall <br />33,063.00 <br />• Fuel Depot Tank Basin <br />1,308.00 <br />- Fuel Depot Pad <br />934.00 <br />• Old Compressor Pads <br />2,970.00 <br />• Lube Shed Pad <br />824.00 <br />• Calyx Pad <br />5,907.00 <br />• Intake Heater Pad <br />305.00 <br />• Babcock Motor Base <br />506.00 <br />• Babcock Pad <br />1,289.00 <br />• Fan Pad <br />524.00 <br />• Helicopter Pad <br />22,125.00 <br />Subtotal for Structure Demolition and Disposal <br />196,251.00 <br />Financial Warranty Reduction <br />Permit M- 1977 -300 <br />1 February, 2002 <br />Page 2 of 4 <br />